Office of Scientific & Technical Information Technical Reports - 14,702 Matching Results

Search Results

open access

40-tube overbore facility location, C Reactor

Description: Possible locations of the projected 40-tube overbore facility at the C Reactor are discussed from the standpoint of obtaining conversion ratio data applicable to a full-reactor overbore program.
Date: April 19, 1961
Creator: Nilson, R.: Nechodom, W. S.
Partner: UNT Libraries Government Documents Department
open access

75,000 KILOWATTS OF ELECTRICITY BY NUCLEAR FISSION AT THE HALLAM NUCLEAR POWER FACILITY

Description: For presentation at ASCE Convention in Reno, Nevada on Thursday, June 23, 1860. A description of the Hallam Nuclear Power Facslity is presented. The history of the project, program participants, site description, component development program, reaetor building, reactor structure, reactor core, sodium systems, instrumentation and control, fuel and component handling, auxsilary sustems, special design features, and advantages of sodium graphite reactor systems are discussed. (M.C.G.)
Date: January 1, 1960
Creator: Gronemeyer, F.C. & Merryman, J.W.
Partner: UNT Libraries Government Documents Department
open access

100-C water plant

Description: System curves for each portion of the C Area Water Plant were obtained from referenced work and are presented in figures. Field test data, corroborating the calculated curves, are presented as singular points on the same graphs. Present maxima capacity of the C Area Filter Plant was 121,000 gpm with 118,000 gpm available for use as primary reactor coolant. Modifications to the filter effluent piping would increase this available flow to about 180,000 gpm. Of the 118,000 gpm available for C Reac… more
Date: February 20, 1961
Creator: Agar, J. D.
Partner: UNT Libraries Government Documents Department
open access

100-K Area electrical power system load and voltage study for project CG-775. Revision

Description: The proposed increased water capacity for 100-K plants will increase the electrical load to be supplied. The load study showed that the capacity of the existing 13.8 kV system is adequate to carry the increased loads proposed for Project CG-775, while for the 5 kV system, an expanded power system is proposed. Likewise, the voltage regulation on the kV system bus will be excessive, and voltage regulators should be added.
Date: February 22, 1960
Creator: Thorson, W. R.
Partner: UNT Libraries Government Documents Department
open access

100-N technical manual. Volume 2A: Systems descriptions

Description: This report contains engineering drawings for the control room, reactor monitoring systems, and reactor control systems for the N reactor. Each console in the control room is detailed. Other systems discussed are: stack air monitoring system, charging machine control systems, and heating and ventilation control systems. A N reactor plant glossary is included.
Date: December 31, 1963
Partner: UNT Libraries Government Documents Department
open access

100-Watt Curium-242 Fueled Thermoelectric Generator--Conceptual Design. SNAP Subtask 5.7 Final Report

Description: A thermoelectric generator which produces 100 watts of electrical power continuously over a six-month operational life in a space environment was designed. It employs the heat produced by the decay of Cm/sup 24/ as the source of power. Uniform output over the operational life of the generator is accomplished by means of a thermally actuated shutter which maintains the hot junction temperature of the thermoelectric conventer at a constunt figure by varying the amount of surplus heat which is rad… more
Date: May 1, 1960
Creator: Weddell, J. B. & Bloom, J.
Partner: UNT Libraries Government Documents Department
open access

105-F intermediate range test hole parameters

Description: This report discusses 105 intermediate range test hole which was bored in 105-F to demonstrate reactor hole boring techniques. This test hole was then utilized to determine the performance of neutron sensitive gamma compensated ion chambers (CIC), the effectiveness of epoxy reactor shield plug designs, the compatability of the prototype.components intermediate range instrumentation, and demonstrate the performance of an intermediate range monitor system on a typical Hanford reactor application.… more
Date: November 16, 1964
Creator: Erickson, G. L.
Partner: UNT Libraries Government Documents Department
open access

190-DR steam turbine backup adequacy report

Description: Because of the questionable performance of the 190-DR steam backup system during the power outage of April 6, 1962, it is felt that a general review of the DR secondary water system capabilities and the standby status of the pumping units is warranted. This report shall briefly describe the performance of the steam backup system during the April 6 power outage and the subsequent power outage of July 10, 1962. Since the former outage, tests have been conducted on the steam pump units to determin… more
Date: November 8, 1962
Creator: Radtke, W. H. & Keplinger, E. R.
Partner: UNT Libraries Government Documents Department
open access

190-H drawdown test

Description: A discrepancy of about 1000 gpm has existed between the full-flow recorded 190, 105 and ROL flows. While past operating practices have not used the 190 or ROL flow rates for official purposes, the disquieting, though not theoretically unexplicable, differences require some quantitative resolution. On November 24, 1962, a drawdown test of the 190-H storage tanks was performed to establish the accuracy of the various flowmeters. The drawdown test of the 190 storage tanks was run at the beginning … more
Date: January 17, 1963
Creator: Cremer, B. R. & Bokish, K. P.
Partner: UNT Libraries Government Documents Department
open access

A 200-Watt Conduction-Cooled Reactor Power Supply for Space Application

Description: The limited supply of relatively long-half-life isotopes having a reasonably high power density and the low conversion efficiencies obtainable with thermoelectric devices have so far limited the power output of isotope-fueled sources of electric power to several tens of watts. In addition, the high cost of the available isotopes results in a very large expense for isotope-fueled generators producing several hundred watts. It appears that a small, minimumweight, conduction-cooled reactor is an a… more
Date: March 1, 1963
Creator: MacFarlane, D. R.
Partner: UNT Libraries Government Documents Department
open access

241-SX tank farm waste storage

Description: Salt wastes from the Redox solvent extraction process have been routed to the 241-SX tank farm for storage since May 21, 1954. Tanks in this farm contain wastes from three types of irradiated uranium processing: (1) low (approximately 250 MWD/T) and (2) high (approximately 600 MWD/T) natural uranium; and (3) E-metal. It is estimated that approximately 1.6 Kgs of Am-Cm, 17 Kgs of Np-237, 20 Kgs of Pu and 8 tons of uranium are present in the sludges from wastes generated through 4-30-64. A total … more
Date: September 3, 1964
Creator: Hanson, G. L.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen