open access

1. Summary of Runs, s56, 57, 73, 74, 78, 79, 80, 87, 88, 89 in Which Slurries Circulated at 300 C in 100-a Loops Caked or Accumulated on Pipe Walls. 2. Summary of Runs T-52 Through T-75 in Which a Bypass Line Was Used in Parallel With Main Circulating Loop

Description: No Description Available.
Date: November 16, 1956
Creator: Kitzes, A. S.; Gallaher, R. B.; McLaughlin, C. A. & Wichner, R. P.
Partner: UNT Libraries Government Documents Department
open access

2\beta + \gamma from B^0 to D^\mp K^0 \pi^\pm Decays at BaBar: aSimulation Study

Description: The authors present the results of a simulation study to perform the extraction of 2{beta} + {gamma} from B{sup 0} {yields} D{sup {-+}}K{sup 0}{pi}{sup {+-}} decays through a time-dependent Dalitz analysis of BaBar data.
Date: April 16, 2007
Creator: Polci, Francesco; Schune, Marie-Helene; Stocchi, Achille & /Orsay, LAL
Partner: UNT Libraries Government Documents Department
open access

3-D sedimentological and geophysical studies of clastic reservoir analogs: Facies architecture, reservoir properties, and flow behavior within delta front facies elements of the Cretaceous Wall Creek Member, Frontier Formation, Wyoming

Description: This project examined the internal architecture of delta front sandstones at two locations within the Turonian-age Wall Creek Member of the Frontier Formation, in Wyoming. The project involved traditional outcrop field work integrated with core-data, and 2D and 3D ground penetrating radar (GPR) imaging from behind the outcrops. The fluid-flow engineering work, handled through a collaborative grant given to PI Chris White at LSU, focused on effects on fluid flow of late-stage calcite cement nodu… more
Date: February 16, 2007
Creator: Bhattacharya, Janok P. & McMechan, George A.
Partner: UNT Libraries Government Documents Department
open access

3 GeV Injector Design Handbook

Description: This Design Handbook is intended to be the main reference book for the specifications of the 3 GeV SPEAR booster synchrotron project. It is intended to be a consistent description of the project including design criteria, key technical specifications as well as current design approaches. Since a project is not complete till it's complete changes and modifications of early conceptual designs must be expected during the duration of the construction. Therefore, this Design Handbook is issued as a … more
Date: December 16, 2009
Creator: Wiedemann, H.
Partner: UNT Libraries Government Documents Department
open access

16-APR-03 Final Release of ENDF/B-V for use with LLNL Codes

Description: The new data files were prepared in two steps. First, the ENDF/B-V database was translated to an ENDL-format ascii database. The ENDL ascii format is a point-wise tabular storage scheme where intermediate values are extracted via interpolation. Sufficient point-wise information was generated in the translation to insure an extraction tolerance of 0.1% for most of the data. The only exception is along the incident neutron energy axis of the outgoing particle energy probability density function w… more
Date: April 16, 2003
Creator: Hill, T S; McNabb, D P; Hedstrom, G W; Beck, B & Hagmann, C A
Partner: UNT Libraries Government Documents Department
open access

45-Day deliverable for Tank 241-BX-105 Auger samples, risers 2 and 6

Description: Two auger samples from single-shell tank 241-BX-105 (BX-105) were extruded, broken down, and analyzed for DSC, TGA, and total alpha as prescribed. Analytical results were tracked and reported using the laboratory information management system known as LabCore. This is the final report for the fiscal year 1995 BX-105 auger sample characterization effort. Included are copies of the differential scanning calorimetry (DSC) and thermogravimetric analyses (TGA) scans as requested. Also included is a … more
Date: November 16, 1994
Creator: Bell, K. E.
Partner: UNT Libraries Government Documents Department
open access

45-Day safety screening for Tank 241-C-103 push mode sample, riser 2

Description: This is the 45-Day report for the Tank 241-C-103 (C-103) push-mode core sampling characterization effort. Problems encountered with the push-mode sampling truck following removal of the first segment from riser 2 resulted in a long delay before resumption of sampling, therefore it was decided to begin the 45-day clock and issue a report based on receipt of this first segment. If subsequent segments are removed from tank C-103, a revision of this report or a new report will be issued to include … more
Date: December 16, 1994
Creator: Bell, K. E.
Partner: UNT Libraries Government Documents Department
open access

100-NR-2 Apatite Treatability Test FY09 Status: High Concentration Calcium-Citrate-Phosphate Solution Injection for In Situ Strontium-90 Immobilization

Description: 100-NR-2 Apatite Treatability Test FY09 Status: High Concentration Calcium-Citrate-Phosphate Solution Injection for In Situ Strontium-90 Immobilization INTERIM LETTER REPORT
Date: December 16, 2009
Creator: Vermeul, Vincent R.; Fritz, Brad G.; Fruchter, Jonathan S.; Szecsody, James E. & Williams, Mark D.
Partner: UNT Libraries Government Documents Department
open access

105-F intermediate range test hole parameters

Description: This report discusses 105 intermediate range test hole which was bored in 105-F to demonstrate reactor hole boring techniques. This test hole was then utilized to determine the performance of neutron sensitive gamma compensated ion chambers (CIC), the effectiveness of epoxy reactor shield plug designs, the compatability of the prototype.components intermediate range instrumentation, and demonstrate the performance of an intermediate range monitor system on a typical Hanford reactor application.… more
Date: November 16, 1964
Creator: Erickson, G. L.
Partner: UNT Libraries Government Documents Department
open access

241-SY modular exhauster pad analysis

Description: The purpose of this document is to show the analytical results which were reached in analyzing the new 241-SY modular exhauster concrete pad and retaining wall. The analysis covers wind loading (80 mph), an equivalent static load due to a seismic event, and from those two results, a determination of the pad thickness and the location and size of reinforcement bar was made. The analysis of the exhauster assembly and sampling cabinet evaluated overturning of the assemblies as a whole. An analysis… more
Date: November 16, 1994
Creator: Kriskovich, J. R.
Partner: UNT Libraries Government Documents Department
open access

291-B-1 stack monitoring and sampling system annual system assessment report

Description: The B Plant 291-B-1 main stack exhausts gaseous effluents to the atmosphere from the 221-B Building canyon and cells, the No. 1 Vessel Ventilation System (VVS1), the 212-B Cask Station cell ventilation system, and, to a limited capacity, the 224-B Building. VVS1 collects offgases from various process tanks in 221-B Building, while the 224-B system maintains a negative pressure in out-of-service, sealed process tanks. B Plant Administration Manual, WHC-CM-7-5, Section 5.30 requires an annual sys… more
Date: December 16, 1994
Creator: Ridge, T. M.
Partner: UNT Libraries Government Documents Department
open access

296-B-13 stack monitoring and sampling system: Annual system assessment report

Description: This report presents the details of the annual system assessment of the air pollution monitoring and sampling system for the 296-13 stack at the Hanford site. Topics discussed include; system description, system status, system aging, spare parts considerations, long term maintenance plan, trends, and items requiring action.
Date: May 16, 1995
Creator: Ridge, T.M.
Partner: UNT Libraries Government Documents Department
open access

324 Building fire hazards analysis implementation plan

Description: In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recom… more
Date: September 16, 1998
Creator: Eggen, C.D.
Partner: UNT Libraries Government Documents Department