2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
Description:
This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined dit…
more
Date:
February 14, 2007
Creator:
Shanklin, D. E.
Item Type:
Refine your search to only
Report