UNT Libraries Government Documents Department - 14,446 Matching Results

Search Results

open access

105 K East isolation barrier acceptance analysis report

Description: The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KE/100K. The tests were performed in accordance with the test plan (McCracken 1995c) and acceptance test procedure (McCracken 1995a). The test report (McCracken 1995b) contains the test data. This document compares the test data (McCracken 1995b) against the criteria (McCracken 1995a, c). A discussion of the leak rate analytical characterization (Irwin 1995) describes… more
Date: May 31, 1995
Creator: McCracken, K. J. & Irwin, J. J.
open access

105 K-West isolation barrier leak recovery plan

Description: Leak testing is being performed in 105 KW to verify the performance of the isolation barriers which have been recently installed. When an 11 inch differential head is established between the main basin and the discharge chute, a leak-rate of approximately 30 - 35 gpm is observed. The leak-rate would be achieved by a 1.65`` - 2`` diameter hole (or equivalent). Analyses suggest that the flow is turbulent/laminar transitional (dominantly turbulent), which would be indicative of a single point leak… more
Date: March 2, 1995
Creator: Wiborg, J.C.
open access

105-KE Basin isolation barrier leak rate test analytical development. Revision 1

Description: This document provides an analytical development in support of the proposed leak rate test of the 105-KE Basin. The analytical basis upon which the K-basin leak test results will be used to determine the basin leakage rates is developed in this report. The leakage of the K-Basin isolation barriers under postulated accident conditions will be determined from the test results. There are two fundamental flow regimes that may exist in the postulated K-Basin leakage: viscous laminar and turbulent fl… more
Date: May 9, 1995
Creator: Irwin, J. J.
open access

105-KE Isolation Barrier Leak Rate Acceptance Test Report

Description: This Acceptance Test Report (ATR) contains the completed and signed Acceptance Procedure (ATP) for the 105-KE Isolations Barrier Leak Rate Test. The Test Engineer`s log, the completed sections of the ATP in the Appendix for Repeat Testing (Appendix K), the approved WHC J-7s (Appendix H), the data logger files (Appendices T and U), and the post test calibration checks (Appendix V) are included.
Date: June 14, 1995
Creator: McCracken, K. J.
open access

105-KW Sandfilter Backwash Pit sludge volume calculation

Description: The volume of sludge contained in the 100-KW Sandfilter Backwash Pit (SFBWP) was calculated from depth measurements of the sludge, pit dimension measurements and analysis of video tape recordings taken by an underwater camera. The term sludge as used in this report is any combination of sand, sediment, or corrosion products visible in the SFBWP area. This work was performed to determine baseline volume for use in determination of quantities of uranium and plutonium deposited in the pit from san… more
Date: February 10, 1995
Creator: Dodd, E.N. Jr.
open access

183-H Basin Mixed Waste Analysis and Testing Report

Description: The purpose of this sampling and analysis report is to provide data necessary to support treatment and disposal options for the low-level mixed waste from the 183-H solar evaporation ponds. In 1973, four of the 16 flocculation and sedimentation basins were designated for use as solar evaporation basins to provide waste reduction by natural evaporation of liquid chemical wastes from the 300 Area fuel fabrication facilities. The primary purpose of this effort is to gather chemical and bulk proper… more
Date: April 1, 1995
open access

183 KE Potable water system analysis plan

Description: Sampling analysis plans (SAP) are a recognized manner of providing applicable requirements for conducting media sampling and analysis in a manner consistent with prescirbed objectives. This SAP has been prepared to satisfy the data quality objectives listed in this SAP with respect to the operation of the 183 KE potable water for K Area.
Date: September 27, 1995
Creator: Hunacek, G.S.
open access

200 area effluent treatment facility opertaional test report

Description: This document reports the results of the 200 Area Effluent Treatment Facility (200 Area ETF) operational testing activities. These Operational testing activities demonstrated that the functional, operational and design requirements of the 200 Area ETF have been met and identified open items which require retesting.
Date: October 26, 1995
Creator: Crane, A.F.
open access

200 Area Liquid Effluent Facilities -- Quality assurance program plan

Description: This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collecti… more
Date: March 13, 1995
Creator: Fernandez, L.
open access

200 area liquid effluent facility quality assurance program plan. Revision 1

Description: Direct revision of Supporting Document WHC-SD-LEF-QAPP-001, Rev. 0. 200 Area Liquid Effluent Facilities Quality Assurance Program Plan. Incorporates changes to references in tables. Revises test to incorporate WHC-SD-LEF-CSCM-001, Computer Software Configuration Management Plan for 200 East/West Liquid Effluent Facilities
Date: October 10, 1995
Creator: Sullivan, N. J.
open access

200 Area Tedf Effluent Sampling and Analysis Plan

Description: This sampling analysis sets forth the effluent sampling requirements, analytical methods, statistical analyses, and reporting requirements to satisfy the State Waste Discharge Permit No. ST4502 for the Treated Effluent Disposal Facility. These requirements are listed below: Determine the variability in the effluent of all constituents for which enforcement limits, early warning values and monitoring requirements; demonstrate compliance with the permit; and verify that BAT/AKART (Best Available … more
Date: June 1, 1995
Creator: Alaconis, W. C.; Ballantyne, N. A. & Boom, R. J.
open access

200 Area treated effluent disposal facility operational test specification

Description: This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.
Date: January 12, 1995
Creator: Crane, A. F.
open access

200 Area treated effluent disposal facility operational test specification

Description: This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.
Date: February 2, 1995
Creator: Crane, A. F.
open access

200 Area Treated Effluent Disposal Facility operational test specification. Revision 2

Description: This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met. The technical requirements for operational testing of the 200 Area TEDF are defined by the test requirements presented in Appendix A. These test requirements demonstrate the f… more
Date: February 9, 1995
Creator: Crane, A.F.
open access

218 E-8 Borrow Pit Demolition Site clean closure soil evaluation report

Description: This report summarizes the sampling activities undertaken and the analytical results obtained in a soil sampling and analyses study performed for the 218 E-8 Borrow Pit Demolition Site (218 E-8 Demolition Site). The 218 E-8 Demolition Site is identified as a Resource Conservation and Recovery Act (RCRA) treatment unit that will be closed in accordance with the applicable laws and regulations. The site was used for the thermal treatment of discarded explosive chemical products. No constituents o… more
Date: June 12, 1995
Creator: Korematsu-Olund, D. M.
open access

222-S laboratory quality assurance plan

Description: This document provides quality assurance guidelines and quality control requirements for analytical services. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing 222-S and 222-SA analytical and quality control activities. The 222-S Laboratory provides analytical services to various clients including, but not limited to, waste characterization for the Tank Waste Remediation Systems (TWRS), waste char… more
Date: April 1, 1995
Creator: Meznarich, H.K.
Back to Top of Screen