UNT Libraries Government Documents Department - 197,600 Matching Results

Search Results

Primary view of A 0. 4 mm Interferometer System Using Dielectric Waveguide
Hutchinson, D. P.; Ma, C. H.; Staats, P. A. & Vander Sluis, K. L.
January 1, 1982
Primary view of 0.7-eV GaInAs Junction for a GaInP/GaAs/GaInAs(1-eV)/GaInAs(0.7-eV) Four-Junction Solar Cell: Preprint
Friedman, D. J.; Geisz, J. F.; Norman, A. G.; Wanlass, M. W. & Kurtz, S. R.
May 1, 2006
Primary view of 0. 9 a Gev /sup 238/U on /sup 238/U collisions in the LBL streamer chamber. Appendix A
Fung, S.Y.; Beavis, D.; Gorn, W.; Keane, D.; Liu, Y.M.; Poe, R.T. et al.
January 1, 1984
Primary view of T = 0 and T = 1 Pairing in Light Nuclei.
Goodman, A. L.
January 1, 1969
Primary view of 0-D study of the compression of low temperature spheromaks
Meyerhofer, D. D.; Hulse, R. A. & Zweibel, E. G.
September 1, 1985
Primary view of The 0/sup +/ /minus/ 1/sup +/ A = 4. lambda. -hypernuclei binding energy difference in an exact equation, separable potential calculation
Gibson, B. F. & Lehman, D. R.
January 1, 1988
Primary view of 0/sup -/ to 0/sup +/ beta decay in A = 16
Gagliardi, C.; Garvey, G. T.; Wrobel, J. R. & Freedman, S. J.
January 1, 1982
Primary view of 1-1/2-Loop Semiscale Isothermal Test Program: Program and System Description in Support of Experiment Data Reports.
Aerojet Nuclear Company
February 1, 1974
Primary view of 1.1 Simulations of a Free-Electron Laser Oscillator at Jefferson Lab Lasing in the Vacuum Ultraviolet
Shinn, Michelle D. & Benson, Stephen V.
April 1, 2013
Primary view of 1-2 GeV synchrotron radiation facility at Lawrence Berkeley Laboratory
Berkner, K.H.
October 1, 1985
Primary view of $1.2 Million in Savings Identified in Akzo Nobel Assessment: Plant-Wide Assessment Summary--Chemicals (Fact Sheet)
unknown creator
August 1, 2003
Primary view of $1.2 Million in Savings Identified in Caraustar Assessment: Plant-Wide Assessment Summary--Forest Products (Fact Sheet)
unknown creator
August 1, 2003
Primary view of 1/2 Sintering of Mullite-Containing Materials: I. Effect of Composition
Sacks, Michael D. & Pask, Joseph A.
December 1, 1981
Primary view of 1,3,5-trichlorobenzene progress report, July--September 1976
Estes, Z. L.
September 1, 1976
Primary view of 1.3 GHz superconducting RF cavity program at Fermilab
Ginsburg, C. M.; Arkan, T.; Barbanotti, S.; Carter, H.; Champion, M.; Cooley, L. et al.
March 1, 2011
Primary view of 1,4-diphenylbutadiyne as a potential tritium getter
Miller, H. H.; Bissell, E. E.; Tsugawa, R. T. & Souers, P. C.
October 1, 1980
Primary view of A 1. 5--4 Kelvin detachable cold-sample transfer system: Application to inertially confined fusion with spin-polarized hydrogens fuels
Alexander, N.; Barden, J.; Fan, Q. & Honig, A.
January 1, 1990
Primary view of 1. 5 GeV/c multiturn shaving extraction and its transport line for the Brookhaven AGS
Weng, W. T.; Blumberg, L. N.; Gill, E.; Soukas, A.; Witkover, R. L.; Egleman, E. et al.
January 1, 1979
Primary view of 1.5-GeV FFAG Accelerator for the AGS Facility
Ruggiero, A. G.; Blaskiewicz, M.; Courant, E.; Trbojevic, D.; Tsoupas, N. & Zhang, W.
February 1, 2004
Primary view of $1.6 Million in Savings Identified in Anchor Assessment: Plant-Wide Assessment Summary--Glass (Fact Sheet)
unknown creator
August 1, 2003
Primary view of $1.6 Million in Savings Identified in Augusta Newsprint Assessment: Plant-Wide Assessment Summary--Forest Products (Fact Sheet)
unknown creator
August 1, 2003
Primary view of A 1.8 K test facility for superconducting RF cavities
Horlitz, G.; Knopf, U.; Lange, R.; Petersen, B.; Sellmann, D.; Trines, D. et al.
April 1, 1994
Primary view of 1?10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review
Maru, H. C.; Singhal, S. C.; Stone, C. & Wheeler, D.
November 1, 2010
Primary view of 1/12-Scale mixing interface visualization and buoyant particle release tests in support of Tank 241-SY-101 hydrogen mitigation
Eschbach, E. J. & Enderlin, C. W.
October 1, 1993
Back to Top of Screen