7-GeV Advanced Photon Source Beamline Initiative. Conceptual Design Report

One of 1,403 items in the series: Argonne National Laboratory Reports available on this site.

PDF Version Also Available for Download.

Description

The DOE is building a new generation 6-7 GeV Synchrotron Radiation Source known as the Advanced Photon Source (APS) at Argonne National Laboratory. This facility, to be completed in FY 1996, can provide 70 x-ray sources of unprecedented brightness to meet the research needs of virtually all scientific disciplines and numerous technologies. The technological research capability of the APS in the areas of energy, communications and health will enable a new partnership between the DOE and US industry. Current funding for the APS will complete the current phase of construction so that scientists can begin their applications in FY 1996. … continued below

Physical Description

vii, 117 p. : ill., charts, tables

Creation Information

Argonne National Laboratory May 1993.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 301 times, with 4 in the last month. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

  • Main Title: 7-GeV Advanced Photon Source Beamline Initiative. Conceptual Design Report
  • Added Title: ANL (Series)
  • Added Title: Argonne National Laboratory Report ANL-93/18
  • Series Title: Argonne National Laboratory Reports

Description

The DOE is building a new generation 6-7 GeV Synchrotron Radiation Source known as the Advanced Photon Source (APS) at Argonne National Laboratory. This facility, to be completed in FY 1996, can provide 70 x-ray sources of unprecedented brightness to meet the research needs of virtually all scientific disciplines and numerous technologies. The technological research capability of the APS in the areas of energy, communications and health will enable a new partnership between the DOE and US industry. Current funding for the APS will complete the current phase of construction so that scientists can begin their applications in FY 1996. Comprehensive utilization of the unique properties of APS beams will enable cutting-edge research not currently possible. It is now appropriate to plan to construct additional radiation sources and beamline standard components to meet the excess demands of the APS users. In this APS Beamline Initiative, 2.5-m-long insertion-device x-ray sources will be built on four straight sections of the APS storage ring, and an additional four bending-magnet sources will also be put in use. The front ends for these eight x-ray sources will be built to contain and safeguard access to these bright x-ray beams. In addition, funds will be provided to build standard beamline components to meet scientific and technological research demands of the Collaborative Access Teams. The Conceptual Design Report (CDR) for the APS Beamline Initiative describes the scope of all the above technical and conventional construction and provides a detailed cost and schedule for these activities. The document also describes the preconstruction R & D plans for the Beamline Initiative activities and provides the cost estimates for the required R & D.

Physical Description

vii, 117 p. : ill., charts, tables

Notes

Digitized from microfiche (2).

Some parts of this report may be illegible, depending on the quality of the microfiche.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • OCLC: 880581479
  • SuDoc Number: Y 3.AT 7:22/ANL-93/18
  • Report No.: ANL-93/18
  • Grant Number: W-31-109-Eng-38
  • Archival Resource Key: ark:/67531/metadc283143

Collections

This report is part of the following collection of related materials.

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 1993

Added to The UNT Digital Library

  • Aug. 4, 2015, 8:33 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 4
Total Uses: 301

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Argonne National Laboratory. 7-GeV Advanced Photon Source Beamline Initiative. Conceptual Design Report, report, May 1993; Argonne, Illinois. (https://digital.library.unt.edu/ark:/67531/metadc283143/: accessed May 26, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen