Figures have and can be generated that indicate a higher charge-discharge rate if required before 105-N will be comparable with existing reactors. Also, these figures show an apparent operating cost incentive to increase the charge-discharge rates proposed for 105-N. Although these figures may be true by themselves, other figures developed from the same information and stated on a basis that affords a true comparison, show that the proposed rates for 105-N are compatible with those in existing reactors. However, the accomplishments of existing reactors should be considered as a guide only and not as Criteria since the design basis has …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
Figures have and can be generated that indicate a higher charge-discharge rate if required before 105-N will be comparable with existing reactors. Also, these figures show an apparent operating cost incentive to increase the charge-discharge rates proposed for 105-N. Although these figures may be true by themselves, other figures developed from the same information and stated on a basis that affords a true comparison, show that the proposed rates for 105-N are compatible with those in existing reactors. However, the accomplishments of existing reactors should be considered as a guide only and not as Criteria since the design basis has already been established for Project CAI-816. An average charge-discharge rate has been proposed for 105-N that is compatible with the two main ground rules of the Project. Namely, the capital cost limitation and the plant factor. This rate of 8 tubes/hr. is one that appears to be reasonable from the charge-discharge design aspects and there is a good possibility that it can be increased with operational experience.
Physical Description
5 p.
Notes
OSTI as DE94016408; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.