Compilation of architectural drawings documenting planned construction and renovations for Willis Library as of May 2018. The first page includes an index to the rest of the schematics which outline the various components of the project including demolition and HVAC (heating, ventilation, and air conditioning) work, mechanical piping, electrical and lighting, and fire sprinklers for each of the five floors (lower level and floors one through four). Each sheet includes technical details, schedules, notes, and other relevant technical information for the work.
We've identified this
technical drawing
as a primary source within our collections. Researchers, educators, and students may find this drawing useful in their work.
Provided By
UNT Libraries
The UNT Libraries serve the university and community by providing access to physical and online collections, fostering information literacy, supporting academic research, and much, much more.
Descriptive information to help identify this technical drawing.
Follow the links below to find similar items on the Digital Library.
Titles
Main Title:
University of North Texas Willis Library MEP Renovations: Construction Documents
Added Title:
Willis Library MEP Renovations: Facilities Management and Construction
Alternate Title:
University of North Texas Willis Library Mechanical, Electrical, and Plumbing Engineering Renovations
Description
Compilation of architectural drawings documenting planned construction and renovations for Willis Library as of May 2018. The first page includes an index to the rest of the schematics which outline the various components of the project including demolition and HVAC (heating, ventilation, and air conditioning) work, mechanical piping, electrical and lighting, and fire sprinklers for each of the five floors (lower level and floors one through four). Each sheet includes technical details, schedules, notes, and other relevant technical information for the work.