Powerplant Productivity Improvement Study: project summary report

PDF Version Also Available for Download.

Description

Key findings from the Illinois Powerplant Productivity Improvement Study are: (1) the historic performance (equivalent availability) of large generating units in Illinois is below national average performance; (2) cost-effective opportunities to improve performance exist, and utilities pursue many of these; (3) there are no strong regulatory disincentives to the undertaking of productivity improvement projects, but no strong incentives either; (4) current utility practices, procedures, and management philosophy toward improved productivity are being strengthened; (5) areas in which immediate attention is warranted include application of reliability engineering tools to the analysis of powerplant availability and more vigorous pursuit of opportunities for … continued below

Physical Description

82 pages

Creation Information

Creator: Unknown. December 21, 1979.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 152 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Key findings from the Illinois Powerplant Productivity Improvement Study are: (1) the historic performance (equivalent availability) of large generating units in Illinois is below national average performance; (2) cost-effective opportunities to improve performance exist, and utilities pursue many of these; (3) there are no strong regulatory disincentives to the undertaking of productivity improvement projects, but no strong incentives either; (4) current utility practices, procedures, and management philosophy toward improved productivity are being strengthened; (5) areas in which immediate attention is warranted include application of reliability engineering tools to the analysis of powerplant availability and more vigorous pursuit of opportunities for performance improvements; (6) DOE systematic methodology for analysis of productivity improvement projects was demonstrated at three units and found to be useful; (7) the potential for improved productivity was estimated to be of the order of 2% in planned and forced outage rates; (8) if a 5% improvement were to be attained, cumulative (through 1990) constant-dollar benefits would be approximately $500 million; (9) formula regulatory incentive mechanisms are presently in a developmental or experimental phase, but adoption by the State of Illinois does not appear warranted at this time; and (10) the Illinois Commerce Commission can encourage improved productivity by explicitly considering recent unit performance during normal rate-case proceedings.

Physical Description

82 pages

Notes

NTIS, PC A05/MF A01.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • December 21, 1979

Added to The UNT Digital Library

  • Feb. 4, 2018, 10:51 a.m.

Description Last Updated

  • March 8, 2021, 12:38 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 152

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Powerplant Productivity Improvement Study: project summary report, report, December 21, 1979; United States. (https://digital.library.unt.edu/ark:/67531/metadc1065912/: accessed May 31, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen