ORR Operations for Period April 1960-April 1961

PDF Version Also Available for Download.

Description

Conversion of the ORR from 20 to 30 Mw operating level was achieved during July 1960 after a scheduled shutdown for completion of a new cooling system. Operating time reached a high of 82% during the last quarter of 1960. The first quarter of 1961 showed an operating time of 80% despite 2 shutdowns and some additional down time to repair mechanisms associated with the shim rods. Changes were made in the south engineering test facility for GCR test loops. Detailed data taken from quarterly operational reports are included. (J.R.D.)

Physical Description

106 pages

Creation Information

Cox, J.A. October 20, 1961.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 15 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Conversion of the ORR from 20 to 30 Mw operating level was achieved during July 1960 after a scheduled shutdown for completion of a new cooling system. Operating time reached a high of 82% during the last quarter of 1960. The first quarter of 1961 showed an operating time of 80% despite 2 shutdowns and some additional down time to repair mechanisms associated with the shim rods. Changes were made in the south engineering test facility for GCR test loops. Detailed data taken from quarterly operational reports are included. (J.R.D.)

Physical Description

106 pages

Source

  • Other Information: Orig. Receipt Date: 31-DEC-62

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • October 20, 1961

Added to The UNT Digital Library

  • Jan. 22, 2018, 7:23 a.m.

Description Last Updated

  • March 22, 2021, 1:49 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 15

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Cox, J.A. ORR Operations for Period April 1960-April 1961, report, October 20, 1961; Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc1053437/: accessed May 27, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen