Preliminary hazard analysis for the Brayton Isotope Ground Demonstration System (including vacuum test chamber)
Description:
The Preliminary Hazard Analysis (PHA) of the BIPS-GDS is a tabular summary of hazards and undesired events which may lead to system damage or failure and/or hazard to personnel. The PHA reviews the GDS as it is envisioned to operate in the Vacuum Test Chamber (VTC) of the GDS Test Facility. The VTC and other equipment which will comprise the test facility are presently in an early stage of preliminary design and will undoubtedly undergo numerous changes before the design is frozen. The PHA and …
more
Date:
November 30, 1975
Creator:
Miller, L. G.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department