Office of Scientific & Technical Information Technical Reports - 146 Matching Results

Search Results

Primary view of 100-B Unit purge June 14, 1945
Dahlen, P. A.
June 1, 1945
Primary view of 100-B unit purge May 20, 1945
Dahlen, P. A.
May 28, 1945
Primary view of 100-D unit purge
Dahlen, P. A.
August 5, 1945
Primary view of 100-D unit purge
unknown creator
June 4, 1945
Primary view of 100-D unit purge
unknown creator
June 20, 1945
Primary view of 100-F area unit purge, May 3, 1945
Kiddker, C. P.
May 22, 1945
Primary view of 100-F unit purge
Dahlen, P. A.
June 16, 1945
Primary view of 100-F unit purge May 20, 1945
Dahlen, P. A.
May 29, 1945
Primary view of 300 Area: December 11 Through December 17
unknown creator
December 21, 1945
Primary view of ABRASIVE BLASTING FOR CLEANING PARTS. (Experiment Performed August 18 through August 25, 1945
McWherter, J.R. & Yerazunis, S.
September 1, 1945
Primary view of Allowable temperature rise in tubes of the piles: Precautions against boiling
Woods, W. K.
September 27, 1945
Primary view of Alloys of Uranium and Silicon. [Part] 2. The Epsilon Phase
Bitsianes, Gust
June 1945
Primary view of Analysis of Dimethyl Ether-Boron Trifluoride
Judson, Charles M.
October 26, 1945
Primary view of ANALYTICAL INFORMATION REPORT FOR THE PERIOD JUNE 1-30, 1945
unknown creator
July 1, 1945
Primary view of ATTEMPTS TO PREPARE TRIFLUOROACETIC ACID BY THE REACTION OF COBALTIC FLUORIDES WITH ACETIC ANHYDRIDE AND ACETONITRILE
Halbedel, H.S.
May 25, 1945
Primary view of Autoclave Tests of Tuballoy Uranium Slugs and Alloys
Bensen, N.; Straetz, R. P. & Draley, J. E.
June 1, 1945
Primary view of The Average Q Meter
Bevis, M.; Osborne, M. J. & Winton, M. L.
September 29, 1945
Primary view of Beta M2 Slit Support
Duncan, F. R.
September 7, 1945
Primary view of C-616 UF$sub 6$ HYDROLYSIS FUMES
Fisher, M. & Cines, M.R.
January 24, 1945
Primary view of Casting Uranium Bars as a Substitute for the Extrusion Process
Lindlief, W. Earl
January 1, 1945
Primary view of CLEANING E-UNITS BY BLASTING
McWherter, J.R. & Yerazunis, S.
September 1, 1945
Primary view of Comparison of observed and calculated flattening at 105-D
Gast, P. F.
February 14, 1945
Primary view of Consequences of high power levels
Worthington, H.
July 6, 1945
Primary view of The Control of the HF Concentration of Electrolyte by Electrical Conductance Measurements. Problem Report for Period February 23, 1944 to November 27, 1944
Turnbull, S. G., Jr.
January 11, 1945
Back to Top of Screen