Office of Scientific & Technical Information Technical Reports - 3,143 Matching Results

Search Results

Primary view of 1. Summary of Runs, s56, 57, 73, 74, 78, 79, 80, 87, 88, 89 in Which Slurries Circulated at 300 C in 100-a Loops Caked or Accumulated on Pipe Walls. 2. Summary of Runs T-52 Through T-75 in Which a Bypass Line Was Used in Parallel With Main Circulating Loop
Kitzes, A. S.; Gallaher, R. B.; McLaughlin, C. A. & Wichner, R. P.
November 16, 1956
Primary view of 2\beta + \gamma from B^0 to D^\mp K^0 \pi^\pm Decays at BaBar: aSimulation Study
Polci, Francesco; Schune, Marie-Helene; Stocchi, Achille & /Orsay, LAL
April 16, 2007
Primary view of 3-D sedimentological and geophysical studies of clastic reservoir analogs: Facies architecture, reservoir properties, and flow behavior within delta front facies elements of the Cretaceous Wall Creek Member, Frontier Formation, Wyoming
Bhattacharya, Janok P. & McMechan, George A.
February 16, 2007
Primary view of 3-D sedimentological and geophysical studies of clastic reservoir analogs: Facies architecture, reservoir properties, and flow behavior within delta front facies elements of the Cretaceous Wall Creek Member, Frontier Formation, Wyoming
Bhattacharya, Janok P. & McMechan, George A.
February 16, 2007
Primary view of 3 GeV Injector Design Handbook
Wiedemann, H.
December 16, 2009
Primary view of 4-D conformal field theories and strings on orbifolds
Kachru, Shamit & Silverstein, Eva
March 16, 1998
Primary view of 4-X program: UO{sub 3} plant expansion
Ingalls, W. P.
September 16, 1954
Primary view of 16-APR-03 Final Release of ENDF/B-V for use with LLNL Codes
Hill, T S; McNabb, D P; Hedstrom, G W; Beck, B & Hagmann, C A
April 16, 2003
Primary view of 45-Day deliverable for Tank 241-BX-105 Auger samples, risers 2 and 6
Bell, K. E.
November 16, 1994
Primary view of 45-Day safety screening for Tank 241-C-103 push mode sample, riser 2
Bell, K. E.
December 16, 1994
Primary view of 100 area weekly report - June 16, 1955
unknown creator
June 16, 1955
Primary view of 100 Areas: (For technical progress letter No. 110), August 6--August 12
Jordan, W. E.
August 16, 1946
Primary view of 100 Areas technical activities report: Physics, November 1949
Carson, A. B.
November 16, 1949
Primary view of 100-F unit purge
Dahlen, P. A.
June 16, 1945
Primary view of 100-NR-2 Apatite Treatability Test FY09 Status: High Concentration Calcium-Citrate-Phosphate Solution Injection for In Situ Strontium-90 Immobilization
Vermeul, Vincent R.; Fritz, Brad G.; Fruchter, Jonathan S.; Szecsody, James E. & Williams, Mark D.
December 16, 2009
Primary view of 105-F intermediate range test hole parameters
Erickson, G. L.
November 16, 1964
Primary view of 236-Z and 291-Z Vacuum Pump System Flow Determination
ELLINGSON, S.D.
May 16, 2000
Primary view of 236-Z and 291-Z Vacuum Pump System Pressure Drop Analysis for Line Size Selection
ELLINGSON, S.D.
May 16, 2000
Primary view of 241-SY modular exhauster pad analysis
Kriskovich, J. R.
November 16, 1994
Primary view of 291-B-1 stack monitoring and sampling system annual system assessment report
Ridge, T. M.
December 16, 1994
Primary view of 291-T Emergency Exhaust Air Scrubbers
Stainken, F. A. R.
July 16, 1948
Primary view of 296-B-13 stack monitoring and sampling system: Annual system assessment report
Ridge, T.M.
May 16, 1995
Primary view of 324 Bldg Liquid Waste Handling System Functional Design Criteria
Ham, J. E.
December 16, 1999
Primary view of 324 Building fire hazards analysis implementation plan
Eggen, C.D.
September 16, 1998
Back to Top of Screen