Search Results

Advanced search parameters have been applied.
open access

Hot helium flow test facility summary report

Description: This report summarizes the results of a study conducted to assess the feasibility and cost of modifying an existing circulator test facility (CTF) at General Atomic Company (GA). The CTF originally was built to test the Delmarva Power and Light Co. steam-driven circulator. This circulator, as modified, could provide a source of hot, pressurized helium for high-temperature gas-cooled reactor (HTGR) and gas-cooled fast breeder reactor (GCFR) component testing. To achieve this purpose, a high-temp… more
Date: June 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Diskless LSI-11 systems

Description: Programs for dedicated LSI-11 based systems can easily be stored in ROM instead of floppy disks, yet execute the same as disk-stored programs. Two sample systems are described.
Date: January 1, 1982
Creator: Ford, W. & Shirk, D. G.
Partner: UNT Libraries Government Documents Department
open access

Near Term Hybrid Passenger Vehicle Development Program. Phase I, Final report. Appendix A: mission analysis and performance specification studies. Volume I

Description: Studies are described which were performed for the Near Term Hybrid Vehicle program to determine passenger car usage patterns and to correlate these trip mission characteristics with vehicle design and performance specifications. (LCL)
Date: April 20, 1979
Creator: Traversi, M. & Barbarek, L.A.C.
Partner: UNT Libraries Government Documents Department
open access

Establishment of viscometer capability for geopressured fluids. Project 61024 final report, November 19, 1978-December 31, 1979

Description: The feasibility of modifying the IGT capillary viscometer for the measurement of methane-saturated brines at 10,000 psi and 200/sup 0/C was evaluated. The viscometer was cleaned, modified, reassembled and pressure treated. The density cells were calibrated to a precision of approximately 7%. The viscosity of pure value was measured and the best value obtained was 6% below values reported in the literature. The operation of the viscometer was time-consuming and required meticulous cleaning betwe… more
Date: October 1, 1980
Creator: Rockar, E. & Randolph, P.
Partner: UNT Libraries Government Documents Department
open access

Evaluation of ISABELLE full cell ultra high vacuum system

Description: The ISABELLE Full Cell Vacuum System consisting of a 40 m long, by 8.8 cm diameter stainless steel tube pumped by seven pumping stations was assembled and processed for 10/sup -12/ Torr operation. Evaluation and testing of the system and its sub-assemblies has been completed. Detail design of system components and the determination of the conditioning process was completed. The best procedure to rough pump, leak test, vacuum bake the system, condition pumps, degas gauges, turn on ion pumps and … more
Date: January 1, 1980
Creator: Foerster, C L; Briggs, J; Chou, T S & Stattel, P
Partner: UNT Libraries Government Documents Department
open access

SLAC linear collider conceptual design report

Description: The linear collider system is described in detail, including the transport system, the collider lattice, final focusing system, positron production, beam damping and compression, high current electron source, instrumentation and control, and the beam luminosity. The experimental facilities and the experimental uses are discussed along with the construction schedule and estimated costs. Appendices include a discussion of space charge effects in the linear accelerator, emittance growth in the col… more
Date: June 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Conceptual design of a superconducting magnet coil for the large coil program. [Flat-wound NbTi coils]

Description: A conceptual design for a toroidal field (TF) coil for a six coil test array has been developed. The electromagnetic, cryogenic, structural, manufacturing, quality assurance and verification testing requirements have been analyzed. The bore is oval shaped and is 2.35 meters horizontally and 3.35 meters vertically. The coil is designed to operate at 8T peak field at rated current of 10450 amperes when the other 5 coils in the toroidal array are at 80% rated current. Using-flat-wound NbTi conduct… more
Date: January 1, 1977
Creator: Quay, R.; Bryant, R. W.; Koenig, R. F.; Ferrante, J. J.; Linkinhoker, C. L.; Donato, J. W. et al.
Partner: UNT Libraries Government Documents Department
open access

Design configuration of GCFR core assemblies

Description: The current design configurations of the core assemblies for the gas-cooled fast reactor (GCFR) demonstration plant reactor core conceptual design are described. Primary emphasis is placed upon the design innovations that have been incorporated in the design of the core assemblies since the establishment of the initial design of an upflow GCFR core. A major feature of the design configurations is that they are prototypical of core assemblies for use in commercial plants; a larger number of the … more
Date: May 1, 1980
Creator: LaBar, M.P.; Lee, G.E. & Meyer, R.J.
Partner: UNT Libraries Government Documents Department
open access

SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 7. Science Applications, Incorporated field test facility preliminary design

Description: This report contains the preliminary design of an SCEAS Engineering Test Facility (ETF). The ETF is a 3600 m/sup 2/ fluid roof greenhouse with an inflated plastic film roof to maintain a clean environment for the fluid roof and to protect the inner glazing from hail and other small missiles. The objective of the design was the faithful scaling of the commercial facility to ensure that the ETF results could be extrapolated to a commercial facility of any size. Therefore, all major features, incl… more
Date: January 1, 1985
Partner: UNT Libraries Government Documents Department
open access

Fermilab 200 MeV linac control system hardware

Description: This report is a description of the present Linac distributed control system that replaces the original Xerox computer and interface electronics with a network of 68000-based stations. In addition to replacing the obsolete Xerox equipment, goals set for the new system were to retain the fast response and interactive nature of the original system, to improve reliability, to ease maintenance, and to provide 15 Hz monitoring of all Linac parameters. Our previous experience with microcomputer insta… more
Date: January 1, 1984
Creator: Shea, M.F.
Partner: UNT Libraries Government Documents Department
open access

Phase I of the Near-Term Hybrid Vehicle Program. Final report

Description: Heat engine/electric hybrid vehicles offer the potential of greatly reduced petroleum consumption, compared to conventional vehicles, without the disadvantages of limited performance and operating range associated with pure electric vehicles. This report documents a hybrid vehicle design approach which is aimed at the development of the technology required to achieve this potential, in such a way that it is transferable to the auto industry in the near term. The development of this design appro… more
Date: September 10, 1979
Partner: UNT Libraries Government Documents Department
open access

Shielding considerations for advanced space nuclear reactor systems

Description: To meet the anticipated future space power needs, the Los Alamos National Laboratory is developing components for a compact, 100 kW/sub e/-class heat pipe nuclear reactor. The reactor uses uranium dioxide (UO/sub 2/) as its fuel, and is designed to operate around 1500 k. Heat pipes are used to remove thermal energy from the core without the use of pumps or compressors. The reactor heat pipes transfer mal energy to thermoelectric conversion elements that are advanced versions of the converters u… more
Date: January 1, 1982
Creator: Angelo, J.P. Jr. & Buden, D.
Partner: UNT Libraries Government Documents Department
open access

Nuclear alkali metal Rankine power systems for space applications

Description: Nucler power systems utilizing alkali metal Rankine power conversion cycles offer the potential for high efficiency, lightweight space power plants. Conceptual design studies are being carried out for both direct and indirect cycle systems for steady state space power applications. A computational model has been developed for calculating the performance, size, and weight of these systems over a wide range of design parameters. The model is described briefly and results from parametric design st… more
Date: August 1, 1986
Creator: Moyers, J. C. & Holcomb, R. S.
Partner: UNT Libraries Government Documents Department
open access

Technology for large tandem mirror experiments

Description: Construction of a large tandem mirror (MFTF-B) will soon begin at Lawrence Livermore National Laboratory (LLNL). Designed to reach break-even plasma conditions, the facility will significantly advance the physics and technology of magnetic-mirror-based fusion reactors. This paper describes the objectives and the design of the facility.
Date: September 4, 1980
Creator: Thomassen, K.I.
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test report for the ground demonstration system pump. 77-KIPS-99

Description: The purpose of this test was to demonstrate that the pump utilized for the developmental program to be conducted on the Kilowatt Isotope Power System (KIPS) fulfilled the requirements of Test Procedure 398A, Component Test Procedure for the Ground Demonstration System Pump. The results of the tests are reported. From these results it was concluded that the pump for the Kilowatt Isotope Power System has satisfactorily completed the requirements of Sundstrand Pump Test Procedure, TP 398A.
Date: February 8, 1978
Creator: Brainard, E.L.
Partner: UNT Libraries Government Documents Department
open access

Axicell design for the end plugs of MFTF-B

Description: Certain changes in the end-plug design in the Mirror Fusion Test Facility (MFTF-B) are described. The Laboratory (LLNL) proposes to implement these changes as soon as possible in order to construct the machine in an axicell configuration. The present physics and technology goals as well as the project cost and schedule will not be affected by these changes.
Date: April 23, 1982
Creator: Thomassen, K.I. & Karpenko, V.N.
Partner: UNT Libraries Government Documents Department
open access

Central receiver solar thermal power system, Phase 1. CDRL Item 2. Pilot plant preliminary design report. Volume IV. Receiver subsystem. [10-MW Pilot Plant and 100-MW Commercial Plant]

Description: The conception, design, and testing of the receiver subsystem proposed by the McDonnell Douglas/Rocketdyne Receiver team for the DOE 10-MW Pilot Plant and the 100-MW Commercial Plant are described. The receiver subsystem consists of the receiver unit, the tower on which the receiver unit is mounted above the collector field, and the supporting control and instrumentation equipment. The plans for implementation of the Pilot Plant are given including the anticipated schedule and production plan (… more
Date: November 1, 1977
Creator: Hallet, Jr., R. W. & Gervais, R. L.
Partner: UNT Libraries Government Documents Department
open access

The product consistency test for the DWPF wasteform

Description: The preliminary specifications on the glass wasteform to be produced by the Defense Waste Processing Facility (DWPF) require extensive characterization of the glass product both before actual production begins and then during production. To aid in this characterization, a leach test was needed that was easily reproducible, could be performed remotely on highly radioactive samples, and could yield results rapidly. Several standard leach tests were examined with a variety of test configurations. … more
Date: January 1, 1990
Creator: Jantzen, Carol M. & Bibler, N. E.
Partner: UNT Libraries Government Documents Department
open access

Mark I 1/5-scale boiling water reactor pressure suppression experiment facility report

Description: An accurate Mark I /sup 1///sub 5/-scale, boiling water reactor (BWR), pressure suppression facility was designed and constructed at Lawrence Livermore Laboratory (LLL) in 11 months. Twenty-seven air tests using the facility are described. Cost was minimized by utilizing equipment borrowed from other LLL programs. The total value of borrowed equipment exceeded the program's budget of $2,020,000. Substantial flexibility in the facility was used to permit independent variation in the drywell pres… more
Date: October 11, 1977
Creator: Altes, R.G.; Pitts, J.H.; Ingraham, R.F.; Collins, E.K. & McCauley, E.W.
Partner: UNT Libraries Government Documents Department
open access

Polarized targets and polarized low energy neutrons at WNR

Description: A description of the experimental setup used at the WNR facility to study the interaction of polarized neutrons with polarized samples is given. Planned measurements of the magnetic moments of compound nuclear resonances are discussed.
Date: January 1, 1980
Creator: Delheij, P. P. J.; Morgan, G. L. & Lisowski, P. W.
Partner: UNT Libraries Government Documents Department
open access

An overview of the ALS

Description: This report giving a overview of the parameters, specifications, and scientific programs of the Advance Light Source. (LSP)
Date: February 1, 1991
Creator: Schlachter, A.S. & Robinson, A.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen