Search Results

Advanced search parameters have been applied.
open access

Control room habitability study: findings and recommendations

Description: The Advisory Committee on Reactor Safeguards (ACRS) has raised a number of concerns related to control room habitability and has recommended actions which they believe could alleviate these concerns. As a result of the ACRS's concerns, the US Nuclear Regulatory Commission's (NRC) Office of Nuclear Reactor Regulation (NRR) in conjunction with the Offices of Research and Inspection and Enforcement, and the NRC regional offices, embarked upon a program to reevaluate Control Room Habitability. Argo… more
Date: January 1, 1986
Creator: Driscoll, J.W.
Partner: UNT Libraries Government Documents Department
open access

Nuclear alkali metal Rankine power systems for space applications

Description: Nucler power systems utilizing alkali metal Rankine power conversion cycles offer the potential for high efficiency, lightweight space power plants. Conceptual design studies are being carried out for both direct and indirect cycle systems for steady state space power applications. A computational model has been developed for calculating the performance, size, and weight of these systems over a wide range of design parameters. The model is described briefly and results from parametric design st… more
Date: August 1, 1986
Creator: Moyers, J. C. & Holcomb, R. S.
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component report for the Ground Demonstration System Accumulator

Description: The Model Number ORC1A3A01 System Accumulator for the Kilowatt Isotope Power System was expulsion tested and demonstrated to be in compliance with the requirements of Sundstrand Explusion Test Procedure, TP 400. Test requirements of TP 400 were extracted from the Kilowatt Isotope Power System, Ground Demonstration System Test Plan.
Date: January 31, 1978
Creator: Brainard, E.L.
Partner: UNT Libraries Government Documents Department
open access

SNAP 19 Viking Program. Bimonthly Technical Progress Report, April-May 1980

Description: Monitoring and evaluation of Viking Lander 1 power system data continued. The RTG series power range as measured at the PCDA was 65 to 67 watts at finroot temperatures between 280/sup 0/F and 310/sup 0/F. The Mars Lander performance history of Viking 1 include both the minimum and maximum data for each of the SOL days. Final available power system data for Viking Lander 2 are shown. Typical SOL day cycles for mission day 1193 are presented. The RTG series power ranged from 69 to 70 watts at fin… more
Date: January 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test report for the ground demonstration system pump. 77-KIPS-99

Description: The purpose of this test was to demonstrate that the pump utilized for the developmental program to be conducted on the Kilowatt Isotope Power System (KIPS) fulfilled the requirements of Test Procedure 398A, Component Test Procedure for the Ground Demonstration System Pump. The results of the tests are reported. From these results it was concluded that the pump for the Kilowatt Isotope Power System has satisfactorily completed the requirements of Sundstrand Pump Test Procedure, TP 398A.
Date: February 8, 1978
Creator: Brainard, E.L.
Partner: UNT Libraries Government Documents Department
open access

Dielectric strengths of new gases and gas mixtures

Description: It is emphasized that the most effective gaseous dielectrics are gas mixtures with components chosen on the basis of fundamental physicochemical knowledge, especially on low-energy electron-molecule interactions. On the basis of such lnowledge, especially on electron attachment and electron slowing down, a number of new gases and gas mixtures have been found with breakdown strengths superior to pure SF/sub 6/. These include the unitary gases c-C/sub 4/F/sub 8/ (perfluorocyclobutane), C/sub 4/F/… more
Date: January 1, 1978
Creator: James, D.R.; Christophorou, L.G.; Pai, R.Y.; Pace, M.O.; Mathis, R.A.; Sauers, I. et al.
Partner: UNT Libraries Government Documents Department
open access

(Technical and engineering support for the Office of Industrial Programs)

Description: As of April 19, 1991, technical, operational and analytic support and assistance to the offices and divisions of the Office of Renewable Energy, under contract DE-AC01-86CE30844 was completed. The overall work effort, initiated February 20, 1986, was characterized by timely, comprehensive, high quality, professional responsiveness to a broad range of renewable energy program operational support requirements. These are no instances of failure to respond, nor unacceptable response, during the fiv… more
Date: January 1, 1991
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test procedure for the ground demonstration system multi-power level combined rotating unit. 77-KIPS-61

Description: This test procedure (No. 402) provides a detailed description of the verification methods which shall be used in the developmental program to be conducted on the Combined Rotating Unit-(CRU) of the Kilowatt Isotope Power System KIPS, to fulfill the requirements of the Ground Demonstration Test Plan. The test objectives were to: establish operating conditions, overspeed conditions and to measure basic performance; measure output power; record spin-down data and calculate bearing losses; calculat… more
Date: December 1, 1977
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: Test Procedure for the Radiator Long and Short Panels. 77-KIPS-111

Description: The objective of this document is to outline the procedure for conducting development tests of sections of the KIPS space radiator. The results of these tests will be utilized to determine the final design and anticipated performance characteristics of the full size ground demonstration system (GDS) radiator. This procedure is applicable to the tests planned for the short panel radiator test assembly (KIPS104000-009) and for the long panel radiator test assembly (KIPS104000-019). The test data … more
Date: January 1, 1977
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test report for the ground demonstration system accumulator. 77-KIPS-100

Description: The purpose of this test was to demonstrate that the system accumulator for the developmental program to be conducted on the Kilowatt Isotope Power System (KIPS) fulfilled the requirements of the test procedure (TP 400) test objectives. The results of the expulsion testing performed on the system accumulator are presented.
Date: October 10, 1977
Creator: Brainard, E.L.
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test report for the Ground Demonstration System Alternator Stator

Description: Results are presented of acceptance tests conducted on the Alternator Stator, S/N 002, for the Kilowatt Isotope Power System. These results show that the Alternator Stator, S/N 002 for the Kilowatt Isotope Power System has satisfactorily completed the testing set forth within Sundstrand Test Specification 2538. Test requirements of TS 2538 were extracted from the Kilowatt Isotope Power System, and Phase I Test Plan.
Date: April 25, 1978
Creator: Brainard, E.L.
Partner: UNT Libraries Government Documents Department
open access

Study of electric field and ion effects on HVDC lines

Description: Progress is reported in research on the electric field and ion effects of bipolar HVDC transmission lines with voltages up to 1500 kV and on the space charge generation characteristics of different types of conductors for HVDC transmission. (LCL)
Date: January 1, 1980
Creator: Comber, M.G. & Johnson, G.B.
Partner: UNT Libraries Government Documents Department
open access

Kilowatt isotope power system. Component test procedure for the ground demonstration system radiator bypass valve

Description: This test procedure provides a detailed description of the verification methods which shall be used in the developmental program to be conducted on the Kilowatt Isotope Power System (KIPS) Radiator Bypass Valve, to fulfill the requirements of the Ground Demonstration System Design Criteria. The test objective is to demonstrate the bypass flow characteristics of the valve as a function of the Jet Condensor Inlet Temperature. To accomplish the test objective the pump discharge temperature (TPO) w… more
Date: April 1, 1977
Partner: UNT Libraries Government Documents Department
open access

Kilowatt isotope power system. Phase II plan. Volume V. Safety, quality assurance and reliability

Description: The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a /sup 238/PuO/sub 2/-fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Included in this volume are: launch and flight safety considerations; quality assurance techniques and procedures to be followed through system fabrication, assembly and inspection; and the reliability program ma… more
Date: March 15, 1978
Partner: UNT Libraries Government Documents Department
open access

Research for Electric Energy Systems

Description: This report documents the technical progress in investigations. The first investigation is concerned with the measurement of magnetic fields in support of epidemiogical and in vitro studies of biological field effects. NIST cohosted a workshop on exposure and biological parameters that should be considered during the vitro studies with extremely low frequency (ELF) magnetic and electric fields. Also, equations were developed to predict the magnetic field in a parallel plate magnetic field expos… more
Date: June 1, 1991
Creator: Anderson, W.E. (ed.)
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test procedure for the ground demonstration system jet condenser focusing. 77-KIPS-59

Description: This test procedure (No. 404) provides a detailed description of the verification methods which shall be used in the development program to be conducted on the Kilowatt Isotope Power System (KIPS) Jet Condenser to fulfill the requirements of the Ground Demonstration Test Plan, Section 6.4.
Date: July 15, 1977
Partner: UNT Libraries Government Documents Department
open access

Design of photovoltaic central power station concentrator array

Description: A design for a photovoltaic central power station using tracking concentrators has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes an advanced Martin Marietta two-axis tracking fresnel lens concentrator. The concentrators are arrayed in 5 MW subfields, each with its own power conditioning unit. The photovoltaic plant output is connected to the existing 115 kV switchyard. The site specific design allows… more
Date: February 1, 1984
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test procedure for the ground demonstration system flow control valve. 77-KIP-57

Description: Test procedures to be used to demonstrate the temperature control function, flow control function, and transient response of the Mechanical Flow-Temperature Control Valve in the Kilowatt Isotope Power System are described in detail. (LCL)
Date: July 11, 1977
Partner: UNT Libraries Government Documents Department
open access

Technical evaluation of the proposed design modifications and technical specification changes on grid voltage degradation for the H. B. Robinson Nuclear Generating Plant, Unit 2

Description: This report documents the technical evaluation of the proposed design modifications and technical specification changes on grid voltage degradation for the H. B. Robinson Nuclear Generating Plant Unit 2. The review criteria are based on IEEE Std. 279-1971, IEEE Std. 308-1974, and General Design Criterion 17 of the Code of Federal Regulations, Title 10, Part 50, Appendix A requirements for determining the acceptability of the proposed system to protect the Class 1E equipment from degradation of … more
Date: July 1, 1980
Creator: Selan, J.C.
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System. Phase II plan. Volume III. Addendum evaluation criteria

Description: Preliminary evaluation criteria for the following aspects of the Kilowatt Isotope Power System (KIPS) are discussed: thermal environment of the heat source and the equipment and materials in this thermal environment; start-up requirements; power degradation; micrometeorite protection; control system; reliability and failure made analysis; quality control; cost; and re-entry survivability. (LCL)
Date: January 1, 1977
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test procedure for the ground demonstration system jet condenser focusing. 77-KIPS-59. Revision A

Description: This test procedure (No. 404A) provides a detailed description of the verification methods which shall be used in the development program to be conducted on the Kilowatt Isotope Power System (KIPS) Jet Condenser to fulfill the requirements of the Ground Demonstration Test Plan, Section 6.4. This is a revision of Test Procedure No. 404.
Date: March 14, 1978
Partner: UNT Libraries Government Documents Department
open access

Design of a photovoltaic central power station: flat-plate array

Description: A design for a photovoltaic central power station using fixed flat-panel arrays has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes high-efficiency photovoltaic modules using dendritic web cells. The modules are arranged in 5 MW subfields, each with its own power conditioning unit. The photovoltaic output is connected to the existing 115 kV utility switchyard. The site specific design allows detailed c… more
Date: February 1, 1984
Partner: UNT Libraries Government Documents Department
open access

Kilowatt Isotope Power System: component test procedure for the ground demonstration system jet condenser orifice performance. 77-KIPS-83

Description: The verification methods which shall be used in the development program to be conducted on the Kilowatt Isotope Power System (KIPS) Jet Condenser to verify adequate orifice thermal performance are described. The purpose of the test procedure is to determine which orifice elements achieve satisfactory thermal performance to assure adequacy for Ground Demonstration System (GDS) Testing.
Date: August 10, 1977
Partner: UNT Libraries Government Documents Department
Back to Top of Screen