Equipment Checkout Prior to Are Processing, Volatility Pilot Plant Run B-1
Description:
The head-end system for the ARE salt was tested with barren salt and shown to be operable. Transfer of the final batch of salt by gravity flow from the bold tank was shown to be feasible with a redesigned feed salt freeze valve. The CRP trap was also redesigned but the remote dumping mechanism did not function properly. (auth)
Date:
May 29, 1958
Creator:
Whitmarsh, C. L.
Item Type: