GEH-4-68, 69, 70: Proposal for variable braze thickness irradiation
Description:
Current NPR fuel production plans call for a thick layer (0.030 inch or greater) of 5% Be + 95% Zry-2 braze alloy in the closure region. This requirement was imposed to eliminate many of the production welding problems brought about by the presence of the low melting braze alloy between two surfaces of Zircaloy. All GEH-4 irradiations in the past have involved very thin braze lines (0.015 inch or less). As a part of the fuel evaluation program it is essential to run a comparative irradiation to…
more
Date:
June 27, 1961
Creator:
Tverberg, J. C. & Kusler, L. E.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department