Search Results

open access

300 Area, January 15--January 21

Description: This report from the reactor fuel manufacturing facilities at Hanford highlights extrusion, canning, and welding operations. Processing of thorium and bismuth is discussed. Radiography of fuels revealed voids that conformed underweight reject measurements.
Date: January 25, 1946
Creator: Kidder, C. P.
Partner: UNT Libraries Government Documents Department
open access

100 Areas, January 15 through January 21

Description: This report gives the weekly progress for the B, D, and F piles. The report also gives a brief discussion of the following activities: process water control and pressure drop studies; purging of D, B, and F piles; slug corrosion studies; tube corrosion studies; thimble corrosion studies; and graphite expansion studies.
Date: January 25, 1946
Creator: Jordan, W. E.
Partner: UNT Libraries Government Documents Department
open access

Processing Leach Solutions From Pyrosulfate Fusions of Salvage Residues for the Recovery of Tuballoy

Description: Report discussing two methods for "the elimination of sulfate and second group interferences in the extraction of tuballoy from residues which have been processed by the pyrosulfate fusion method." Advantages for one of the methods are mentioned.
Date: January 25, 1946
Creator: Ryon, A. D.; Aikin, L. M. & Susano, C. D.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen