Final report on PT-105-630-A: Pile power distribution control at the K piles
Description:
Following-the K-pile start-ups in early 1955, a program of planned power raises was begun. The operating level had reached 1700--2000 MW by late 1955, and a severe operational control problem became apparent; the power distribution in the reactor was difficult to control and appeared inherently unstable. A study of available data led to the initiation of a production test so that a more detailed study of the phenomena could be made. This report describes the measures taken which led to an impro…
more
Date:
February 18, 1959
Creator:
Brugge, R. O.
Item Type: