D0 Silicon Upgrade: Lower Cleanroom Roof Quick Load Analysis
Description:
This engineering note documents calculations done to determine the margin of safety for the lower clean room roof. The analysis was done to give me a feeling of what the loads, stresses and capacity of the roof is prior to installation and installation work to be done for the helium refrigerator upgrade. The result of this quick look showed that the calculated loads produce stress values and loads at about half the allowables. Based on this result, I do not think that special precautions above …
more
Date:
November 17, 1995
Creator:
Rucinski, Russ
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department