Design considerations regarding slug ruptures in the intermediate power level reactor
Description:
The minimum shutdown time, to permit accessibility, for the Intermediate Power Reactor is estimated to be 38 hours. In case the reactor were shutdown following each rupture this long shutdown period would have serious disadvantages. The desirability of being able to make firm power commitments (independent of slug ruptures) has led to a study of the possibility of continuous operation following a rupture. There is evidence to indicate that, at the proposed water temperature, the rate of corrosi…
more
Date:
November 1, 1954
Creator:
Pearl, W. L. & Pursel, C. A.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department