Experiments and simulation of high current operation at CEBAF
Description:
The superconducting rf, cw electron accelerator at CEBAF has achieved the design energy of 4 GeV using 5-pass recirculation through a pair of 400 MeV linacs. Stable beam current of 35 {mu}A has been delivered to the Experimental Hall C. The total beam current that has been recirculated so far is 248 {mu}A. Measurements of the performance of the rf control system have been made in both pulsed and cw mode, and a numerical model has been developed which describes the beam-cavity interaction, inclu…
more
Date:
July 1, 1996
Creator:
Merminga, L.; Crawford, K.; Delayen, J. R.; Doolittle, L.; Hovater, C.; Kazimi, R. et al.
Partner:
UNT Libraries Government Documents Department