D0 Silicon Upgrade: Redesign of the Low Conductivity Water (LCW) System at D-Zero
Description:
Due to the relocation of a magnet power supply, the installation of a buss, and an installation of chokes. and their need for cooling water a redesign of the Low Conductivity Water (LCW) system has been undertaken. This new system required the determination of an optimal pipe diameter for the High Bay pipe as well as the determination of the pressure drop and temperature rise in the buss. Based on numerous calculations it has been determined that the High Bay pipe should be 1 1/2 inch (1.90 O.D…
more
Date:
October 15, 1996
Creator:
Zaczek, Mariusz
Partner:
UNT Libraries Government Documents Department