Search Results

open access

1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2

Description: From introduction: "Presents the detailed description of a 1000 MW Electric Power Plant employing one or two Boiling Water Reactors as the steam source."
Date: February 14, 1964
Creator: General Electric Company
Partner: UNT Libraries Government Documents Department
open access

1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3

Description: From introduction: "Contains the appendices and a complete set of drawings related to the 1000 MWe Boiling Water Reactor Plant Feasibility Study performed by the General Electric Company for the United States Atomic Energy Commission."
Date: February 14, 1964
Creator: General Electric Company
Partner: UNT Libraries Government Documents Department
open access

Survey of Piping Failures for the Reactor Primary Coolant Pipe Rupture Study

Description: From summary: "An industrial piping failure survey covering 701 contacts in electric utilities, petroleum refineries, chemical processing, marine applications, architect-engineers, component manufacturers, piping fabricating and erectors, insurance companies, and others was conducted as part of the Reactor Primary Coolant Rupture Study."
Date: May 1964
Creator: U.S. Atomic Energy Commission
Partner: UNT Libraries Government Documents Department
open access

Analytical Studies of Transient Effect in Fast Reactor Fuels: [Part] 1

Description: From abstract: "An experimental program to evaluate the performance of FCR and EFCR fuel during transient operation is outlined and possible mechanisms of failure are analyzed."
Date: August 1962
Creator: Osborn, R. B. & Sherer, D. B.
Partner: UNT Libraries Government Documents Department
open access

Methods, System Optimization, and Safety Studies for a 1000 MegaWatt Sodium-Cooled Fast Reactor: Task 3 and 5 report of 1000 MegaWatt Liquid Metal Fast Breeder Reactor Follow-On Work

Description: From introduction: "Evaluation of trade-off and optimization studies in which numerous design parameters and economic ground-rules are varied to determine the effect on the economics of the reference concept. Selected safety studies."
Date: February 1969
Creator: General Electric Company
Partner: UNT Libraries Government Documents Department
open access

Comparison of Two Sodium-Cooled, 1000 MegaWatt Fast Reactor Concepts: Task 1 Report of 1000 MegaWatt Liquid Metal Fast Breeder Reactor Follow-On Work

Description: From introduction: "The development of one or more nuclear steam supply system concepts, with certain trade-off studies to aid in the definition of these concepts. The selection of a reference concept for further study."
Date: June 1968
Creator: General Electric Company
Partner: UNT Libraries Government Documents Department
Back to Top of Screen