Acceptance test specifications for test number eleven: sodium system filling, heatup, pressurization, and drain. [LMFBR]

Description: This document provides the general instructions for performing acceptance test number eleven as indicated in the Acceptance Test Index (TI-022-130-003). Also indicated are the plant conditions and special equipment required to conduct the test. The acceptance criteria for each portion of the test are specified.
Date: May 1, 1975
Creator: Bell, C.R.
Partner: UNT Libraries Government Documents Department
open access

Study of fast reactor safety test facilities. Preliminary report

Description: Included are sections dealing with the following topics: (1) perspective and philosophy of fast reactor safety analysis; (2) status of accident analysis and experimental needs; (3) experiment and facility definitions; (4) existing in-pile facilities; (5) new facility options; and (6) data acquisition methods. (DG)
Date: May 1, 1975
Creator: Bell, G. I.; Boudreau, J. E.; McLaughlin, T.; Palmer, R. G.; Starkovich, V.; Stein, W. E. et al.
Partner: UNT Libraries Government Documents Department
open access

Vault roof analysis: load capacity. [LMFBR]

Description: Load capacities of the vault roof beams, in terms of total LLTV upward dynamic thrust are determined as follows: 533 kips, faulted condition and 455 kips, emergency condition.
Date: May 13, 1975
Creator: Wood, W.
Partner: UNT Libraries Government Documents Department
open access

Acceptance-test specifications for Test Number Four: process sensor and display test. [LMFBR]

Description: This document provides the general instructions for performing acceptance Test Number Four as indicated in the Acceptance Test Index (TI-022-130-003). Also indicated are the plant conditions and special equipment required to conduct the test. The acceptance criteria for each portion of the test are specified.
Date: May 9, 1975
Creator: Bell, C.R.
Partner: UNT Libraries Government Documents Department
open access

Hawaii Geothermal Project summary report for Phase I

Description: The phase I activities are summarized as follows: management, the geophysical program, the engineering program, the environmental--socioeconomic program, and the drilling program. (MHR)
Date: May 1, 1975
Partner: UNT Libraries Government Documents Department