Search Results

open access

Experiments and Analysis for SM-1 Core II With Special Components

Description: Abstract: This technical report contains a summary of analytical and experimental work performed on SM-1 Core II, with special components is presented. The effects of these special assemblies upon power distribution and core reactivity were calculated and compared to experimental measurements. A thermal analysis was conducted to determine steady state and transient performance of the special test components of the core as well as some of the hotter standard Core II components. Experimental work… more
Date: January 1, 1961
Creator: Lee, D. H.; Robinson, R. A. & Segalman, I.
Partner: UNT Libraries Government Documents Department
open access

Investigation of 17-4 PH Steel Components Used in SM-1, SM-1A, PM-2A Reactor Plants

Description: Abstract: This technical report covers the investigation of 17-4 PH steel components used in the SM-1, SM-1A and PM-2A nuclear power plants, which consist of control rod drive racks, pinions, seal shafts and associated parts. Evidence supporting the continued use of 17-4 PH steel in these applications is presented. Alco's current procurement and processing specifications for 17-4 PH steel are included. The evidence presented is in the form of stress calculations, test and environmental data and… more
Date: January 23, 1962
Creator: Haraway, E. S. & Saccocio, R. M.
Partner: UNT Libraries Government Documents Department
open access

Nuclear Measurements for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A CE 3

Description: Abstract: This technical report contains the description and results of an experimental program to evaluate the effect of utilizing Type 3 (SM-2) replacement cores in existing Army field plants SM-1, SM-1A and PM-2A. This program, conducted at the Alco Products Critical Facility, employed SM-2 mockup fuel elements similar in composition to Type 3 fuel elements to determine start-up characteristics of Type 3 cores in SM-1, SM-1A and PM-2A core configurations. measurements include comprehensive … more
Date: January 11, 1962
Creator: Raby, T. M.; Walthousen, L. D.; Kemp, S. N.; McCool, W. J.; Sontheimer, K. C. & Robinson, R. A.
Partner: UNT Libraries Government Documents Department
open access

SM-1 Reactor Core Inspection at 2/3 Core Life : March 7, 1959 to May 17, 1959

Description: Abstract: This technical report is concerned with the program and results of the SM-1 reactor vessel head removal and core inspection at Fort Belvoir, Virginia from the period March 7, 1969 to May 17, 1959. It covers the operating procedures in detail and records the conditions found and problems encountered in order to make a record for reference in future work of this nature. The major objective of the program, to obtain irradiation data on the SM-1 type core, has been met. The boron contro… more
Date: January 13, 1960
Creator: Obrist, C. H.; Byrne, B. J.; Connolly, T. F.; Foley, D. D.; Lichtenberger, R. V.; Mackay, S. D. et al.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen