In-Core Instrumentation Development Program Quarterly Progress Report September - December 1963

Description: Introduction: The objective of Project Agreement 22 is to determine the feasibility of using in-core ion chambers to cover the complete reactor neutron flux startup range from 10(4) -5 - 10(13) nv using in-core ion chambers. The counting mode of operation will be used at low neutron flux levels and the RMS voltage fluctuation mode (Campbell Theorem) will be used at high neutron flux levels. The June-September Progress Report (GEAP-4386) shows how the RMS voltage mode can be used, discusses c… more
Date: January 1964
Creator: DuBridge, R. A.
Partner: UNT Libraries Government Documents Department
open access

Nuclear Measurements for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A CE 3

Description: Abstract: This technical report contains the description and results of an experimental program to evaluate the effect of utilizing Type 3 (SM-2) replacement cores in existing Army field plants SM-1, SM-1A and PM-2A. This program, conducted at the Alco Products Critical Facility, employed SM-2 mockup fuel elements similar in composition to Type 3 fuel elements to determine start-up characteristics of Type 3 cores in SM-1, SM-1A and PM-2A core configurations. measurements include comprehensive … more
Date: January 11, 1962
Creator: Raby, T. M.; Walthousen, L. D.; Kemp, S. N.; McCool, W. J.; Sontheimer, K. C. & Robinson, R. A.
Partner: UNT Libraries Government Documents Department
open access

SM-1 Reactor Core Inspection at 2/3 Core Life : March 7, 1959 to May 17, 1959

Description: Abstract: This technical report is concerned with the program and results of the SM-1 reactor vessel head removal and core inspection at Fort Belvoir, Virginia from the period March 7, 1969 to May 17, 1959. It covers the operating procedures in detail and records the conditions found and problems encountered in order to make a record for reference in future work of this nature. The major objective of the program, to obtain irradiation data on the SM-1 type core, has been met. The boron contro… more
Date: January 13, 1960
Creator: Obrist, C. H.; Byrne, B. J.; Connolly, T. F.; Foley, D. D.; Lichtenberger, R. V.; Mackay, S. D. et al.
Partner: UNT Libraries Government Documents Department
open access

High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963

Description: Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development. All fuel irradiation has been terminated with the final shutdown of the VBWR. The high burnup average achieved by a single assembly in the group is 10,000 MWD/T (assembly 1F). Twenty-one of the original 24 assemblies have failed or are suspected of failure. Pr… more
Date: January 1, 1964
Creator: Holladay, R. L.
Partner: UNT Libraries Government Documents Department