Search Results

open access

Results of Preliminary Drilling, Red Rock, Arizona

Description: Abstract: Structure drilling under Contract No. AT(05-l)-120 was begun May 13, 1951, and was suspended June 30, 1951, at Red Rock, Arizona with the completion of 12 holes and 2,390.5 feet of drilling. No mineralization was disclosed in the widely spaced holes. The structure and rock composition was found favorable for a potential drilling area.
Date: October 16, 1952
Creator: Anderson, Andrew H.; Foster, John R. & Hurley, Daniel B.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen