Search Results

open access

Bates solar industrial process steam application environmental impact assessment

Description: It is planned to install 34,440 square feet of linear parabolic trough solar collectors at a new corrugator plant for making corrugated boxes. The system is to operate in parallel with a fossil fuel boiler. An assessment is presented of the impacts of the solar energy system on the existing environment and to determine whether or not a more detailed environmental impact statement is needed. The environmental assessment is based on actual operational data obtained on the collector, fluid, and he… more
Date: June 30, 1981
Partner: UNT Libraries Government Documents Department
open access

Development and production cost analysis for subatmospheric Brayton system for Brayton-cycle heat-recovery system, characterization program, Subtask A. 4. 2. 4 of Phase I program plan

Description: This document reports on the cost analysis previously performed for a subatmospheric Brayton cycle system sized to operate off the waste heat of a nominal 200-ton per day glass container furnace. Along with product value and operating costs, the cost data for system components is one of the essential elements required for analyses and prediction of the return-on-investment for a Brayton system. The expected ROI or payback will in turn impact the marketability of the system. This report describe… more
Date: June 30, 1980
Partner: UNT Libraries Government Documents Department
open access

Stress Analysis of the SM-1A Reactor Vessel

Description: The stress analysis performed on the SM-lA reactor vessel and cover is presented. The msximum combined stress (51,360 psi in compression) occurs in the vessel cover during a 50 deg F/hr transient. A fatigue analysis of these stresses indicated that they could be applied safely at least 2500 times, and since the vessel is expected to receive less than 900 cycles, it should not suffer any fatigue damage. (auth)
Date: March 30, 1962
Creator: McLaughlin, D. W.; Rowekamp, B. J.; Chittum, R. A. & Aitken, C. C.
Partner: UNT Libraries Government Documents Department
open access

Development of improved iron Fischer-Tropsch catalysts

Description: The objective of proposed research is development of catalysts with enhanced slurry phase activity and better selectivity to fuel range products, through a more detailed understanding and systematic studies of the effects of pretreatment procedures and promoters/binders (silica) on catalyst performance.
Date: April 30, 1990
Creator: Bukur, D.B.; Patel, S.A.; Dalai, A.K.; Jayanthi, G. & Ledakowicz, S.
Partner: UNT Libraries Government Documents Department
open access

PL FINAL DESIGN REPORT. VOLUME V. CORE DRAWINGS AND SPECIFICATIONS

Description: Drawings andd specifications for the PL reactor core are given. The requirements for the material procurement, fabrication, testing, and inspection of one P L-2 reactor core and spares are listed. (M.C.G.)
Date: June 30, 1961
Partner: UNT Libraries Government Documents Department
open access

MARITIME GAS-COOLED REACTOR PROGRAM QUARTERLY PROGRESS REPORT FOR PERIOD ENDING, SEPTEMBER 30, 1960

Description: The feasibility was studied and a cost estimate prepared of an experimental reactor to determine the operating characteristics of beryllia- moderated, gas-cooled systems wtthin a power limit of 10 Mw(t). The heat energy produced by the experimental reactor is to be dissipated in a heat dump. No machinery for production of power was to be provided. Other requirements were that the reactor should be capable of testing core types different from the current MGCR design, and the system should permit… more
Date: September 30, 1960
Partner: UNT Libraries Government Documents Department
open access

Process Development and Fabrication of PbTe Thermoelectric Elements

Description: The development and fabrication of Pb-Te pellets, contacted to Fe end caps, for use as elements in thermoelectric converters for the SNAP 10A program, is described. The method adopted consists of contacting, by hot pressing in a controlled atmosphere, 24 pellets simultaneously, using q-layer, 8-cavity graphite dies. The optimum hot pressing parameters were found to be 5000 psi at 1550 deg F for 30 min. Several thousand elements were produced by this relatively high-volume process, modifying the… more
Date: October 30, 1962
Creator: Bennett, F. R. & Langrod, K.
Partner: UNT Libraries Government Documents Department
open access

Controlled Synthesis of Polyenes by Catalytic Methods. Progress Report for the period December 1, 1989 - November 30, 1992

Description: A more direct approach to polyenes by the direct polymerization of acetylenes has been achieved. We were able to show that polymerization of acetylene itself can be controlled with a well- characterized alkylidene catalyst, but only if a base such as quinuclidine is present in order to slow down the rate of propagation relative to initiation. (Quinuclidine may also stabilize vinylalkylidene intermediates formed in the reaction). Unfortunately, living polyenes'' were no more stable than isolated… more
Date: November 30, 1992
Creator: Schrock, R. R.
Partner: UNT Libraries Government Documents Department
open access

Safety Analysis Report for Packaging (SARP): USA/9507/BLF (ERDA--AL), Model AL-M1. [Configurations 1, 3, and 5]

Description: The SARP includes structural integrity, thermal resistance, radiation shielding and radiological safety, nuclear criticality safety, and quality control of three insulated drum shipping containers identified as USA/9507/BLF (ERDA-AL), also called AL-M1, configurations 1, 3, and 5. Complete physical and technical descriptions of the packages are presented. Each package consists of an inner container centered within an insulated steel drum. The contents are plutonium-239 and uranium-235 in config… more
Date: September 30, 1977
Creator: Watkins, R. A.; Bertram, R. E.; Blauvelt, R. K.; Edling, D. A.; Flanagan, T. M.; Griffin, J. F. et al.
Partner: UNT Libraries Government Documents Department
open access

Municipal waste energy recovery

Description: Materials recovery and energy recovery from municipal solid waste, offering at least a partial solution to a city's solid waste management and disposal problem, are discussed. The most important barriers and issues which relate to energy and materials recovery from waste in urban areas are discussed. Energy recovery practices and processes, environmental issues, and municipal market economics are considered. (MCW)
Date: October 30, 1979
Partner: UNT Libraries Government Documents Department
open access

3D field harmonics

Description: We have developed an harmonic representation for the three dimensional field components within the windings of accelerator magnets. The form by which the field is presented is suitable for interfacing with other codes that make use of the 3D field components (particle tracking and stability). The field components can be calculated with high precision and reduced cup time at any location (r,{theta},z) inside the magnet bore. The same conductor geometry which is used to simulate line currents is … more
Date: March 30, 1991
Creator: Caspi, S.; Helm, M. & Laslett, L.J.
Partner: UNT Libraries Government Documents Department
open access

Process development for automated solar cell and module production. Task 4: automated array assembly

Description: The scope of work under this contract involves specifying a process sequence which can be used in conjunction with automated equipment for the mass production of solar cell modules for terrestrial use. This process sequence is then critically analyzed from a technical and economic standpoint to determine the technological readiness of each process step for implementation. The process steps are ranked according to the degree of development effort required and according to their significance to t… more
Date: June 30, 1980
Creator: Hagerty, J.J.
Partner: UNT Libraries Government Documents Department
open access

Mass spectrometer for the analyses of gases

Description: A 6-in-radius, 60/sup 0/ magnetic-sector mass spectrometer (designated as the MS-200) has been constructed for the quantitative and qualitative analyses of fixed gases and volatile organics in the concentration range from 1 ppM (by volume) to 100%. A partial pressure of 1 x 10/sup -6/ torr in the inlet expansion volume is required to achieve a useful signal at an electron-multiplier gain of 10,000.
Date: June 30, 1980
Creator: Ferguson, J. R. & Rogers, E. R.
Partner: UNT Libraries Government Documents Department
open access

Silicon web process development. Annual report

Description: During this reporting period significant milestones have been met. A new barrier crucible design which consistently maintains melt stability over long periods of time has been successfully tested and used in long growth runs. The pellet feeder for melt replenishment was operated continuously for growth runs of up to 17 hours (a one day growth cycle). The liquid level sensor comprising a laser/sensor system was operated, performed well, and meets the requirements for maintaining liquid level hei… more
Date: June 30, 1980
Creator: Duncan, C. S.; Seidensticker, R. G.; McHugh, J. P.; Hill, F. E.; Skutch, M. E.; Driggers, J. M. et al.
Partner: UNT Libraries Government Documents Department
open access

Lawrence Berkeley Laboratory year-end-report on heavy-ion fusion program

Description: An intensive theoretical program was launched to try to understand the conditions for safe propagation of intense beam currents in focussing systems, such as continuous and interrupted solenoid lens systems, and quadrupole strong-focussing systems. Analytic methods have led to significant advances in understanding of the new problems; with computational techniques a large amount of new information has been generated on space-charge-dominated transport phenomena; also, at this time a new LBL par… more
Date: September 30, 1977
Creator: Keefe, D.
Partner: UNT Libraries Government Documents Department
open access

Ocean thermal energy. Quarterly report, January-March 1982

Description: This quarterly report summarizes work of the following tasks as of March 31, 1982: OTEC pilot plant conceptual design review; OTEC methanol; review of electrolyzer development programs and requirements; financial and legal considerations in OTEC implementation; potential Navy sites for GEOTEC systems; hybrid geothermal-OTEC power plants: single-cycle performance estimates; and supervision of testing of pneumatic wave energy conversion system.
Date: March 30, 1982
Partner: UNT Libraries Government Documents Department
open access

Hydrogeochemical and stream sediment reconnaissance basic data for Rapid City NTMS Quadrangle, South Dakota

Description: Results of a reconnaissance geochemical survey of the Rapid City Quadrangle are reported. Field and laboratory data are presented for 417 groundwater and 477 stream sediment samples. Statistical and areal distributions of uranium and possible uranium-related variables are displayed. A generalized geologic map of the survey area is provided, and pertinent geologic factors which may be of significance in evaluating the potential for uranium mineralization are briefly discussed. Groundwater data i… more
Date: June 30, 1980
Partner: UNT Libraries Government Documents Department
open access

Task XVIII. Technology base assessment

Description: International Conservation and solar energy activities are discussed in view of the enormous increase in oil prices. The current economic outlook of non-oil producing countries is examined. The specific international US energy activities and programs relating to developed and developing countries are described. Problems facing international energy activities are examined. Information on the regional US solar energy centers is included. (MCW)
Date: June 30, 1980
Partner: UNT Libraries Government Documents Department
open access

Microwave-vacuum drying system (MIVAC). Progress report No. 4

Description: Progress in developing a microwave-vacuum system (MIVAC) for drying grain at a commercial grain handling and storage facility is reported. During this period the dryer was redesigned from 48 kW size to 12 kW, components were fabricated and assembled, and performance testing with corn drying was begun. (LCL)
Date: June 30, 1978
Creator: Wear, F. C.
Partner: UNT Libraries Government Documents Department
open access

Analysis of options for a solar development bank. Task VI

Description: Financial barriers which hinder the use and acceptance of solar technology in the building and industrial markets are identified. The barriers fall under three categories: risk, liquidity, and subsidy. Policy initiatives that can be used to overcome financing barriers which hinder the use of solar technology are briefly mentioned. These include direct lending programs operated by the government or by private banks and secondary financing organizations which provide liquidity and security to mor… more
Date: September 30, 1979
Partner: UNT Libraries Government Documents Department
open access

Silicon on ceramic process. Silicon sheet growth development for the Large-Area Silicon Sheet Task of the Low-Cost Silicon Solar Array Project. Annual report No. 2, September 17, 1976--September 19, 1977

Description: The objective of this research program is to investigate the technical and economic feasibility of producing solar-cell-quality sheet silicon by coating one surface of carbonized ceramic substrates with a thin layer of large-grain polycrystalline silicon from the melt. In the past year significant progress was made in all areas of the program. The physical and chemical properties of the standard mullite refractory used for the majority of the coating runs (McDanel MV20 and Coors S1SI) have been… more
Date: September 30, 1977
Creator: Zook, J.D.; Heaps, J.D.; Maciolek, R.B.; Koepke, B.; Butter, C.D. & Schuldt, S.B.
Partner: UNT Libraries Government Documents Department
open access

Compressed air systems. A guidebook on energy and cost savings

Description: This guidebook shows how energy can be saved in compressed air systems. It discusses basic compressed air systems which are typical of those found in industry and describes them and the engineering practices behind them. Energy conservation recommendations follow. These recommendations cover equipment selection, design, maintenance, and operation. Included is information which will help the reader to make economic evaluations of various engineering and equipment alternatives as they affect oper… more
Date: March 30, 1984
Partner: UNT Libraries Government Documents Department
open access

Annual work plan for FY 1992

Description: The Office of Inspector General (OIG) has an overall mission to prevent and detect fraud, waste, and mismanagement in Department of Energy (DOE) programs. As part of its responsibility in accomplishing its mission, the DOE Office of Audits publishes an Annual Work Plan'' in September of each year. The prime focus of the plan is to identify opportunities for audits to enhance the effectiveness, efficiency, and integrity of the DOE's programs and operations. Through this plan, we are able to maxi… more
Date: September 30, 1991
Partner: UNT Libraries Government Documents Department
Back to Top of Screen