Search Results

open access

The U.S. Bureau of Mines Funding - FY1996

Description: H.R. 1977, passed by the House July 18, 1995, appropriated $87 million for FY1996 for the "orderly closure" of the Bureau of Mines within the Department of Interior. However, when the Senate passed H.R. 1977 on August 9, it approved continuation of the Bureau and appropriated $128 million for FY1996.
Date: August 30, 1995
Creator: Thompson, Duane A.
Partner: UNT Libraries Government Documents Department
open access

FY96 Support to the Defense Information Systems Agency (DISA), Center for Standards (CFS) for continuing improvement of the DoD HCI Style Guide. Final report

Description: PNNL successfully completed the three tasks: Task 1 - This task provided DISA with an updated set of design checklists that can be used to measure compliance with the Style Guide. These checklists are in Microsoft{reg_sign}Word 6.0 format. Task 2 - This task provided a discussion of two basic models for using the Style Guide and the Design Checklist, as a compliance tool and as a design tool.
Date: September 30, 1996
Creator: Avery, L.W.; Donohoo, D.T.; Sanchez, J.A. & Gellert, D.A.
Partner: UNT Libraries Government Documents Department
open access

Materials corrosion and mitigation strategies for APT: End of year report, FY `96

Description: The authors major accomplishment in FY96 was the design and fabrication of the corrosion probes to be used ``In Beam`` during the FY97 irradiation period to begin on February 1, 1997. Never before have corrosion rate measurements been made on-line in such a high radiation environment. To measure corrosion rate as a function of beam time, it is necessary to electrical isolate the corrosion electrode to be examined form the plumbing system. Conventionally, this is accomplished with glass seals. H… more
Date: October 30, 1996
Creator: Lillard, R.S. & Butt, D.P.
Partner: UNT Libraries Government Documents Department
open access

Waste pretreatment and interfacing system dynamic simulation model (ITHINK model) FY-96 year-end report

Description: The Waste Pretreatment and Interfacing Systems Dynamic Simulation (ITHINK) Model (see WHC-SD-WM-DR-013) was originally created to investigate the required pretreatment facility processing rates required to meet the Tri-Party Agreement (TPA) waste vitrification milestones. The TPA milestones are satisfied by retrieving the TX tank farm (salt cake) single-shell tanks (SSTs)first and by utilizing a relatively constant retrieval rate to the year 2018 when retrieval is completed.
Date: September 30, 1996
Creator: Harmsen, R. W.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen