PT IP-603-I, Evaluation of accidental fuel flushing potential D-DR reactors. Final report
Description:
The purpose of Production Test IP-603-I described in this report was to obtain data to help determine if uranium I&E fuel can be flused from tubes set up for discharge on a valved down corssheader by raising the front riser pressure. The test consisted of valving down one header at shutdown riser pressure, then increasing the riser pressure and recording the resulting front nozzle pressures on selected tubes uncapped on the rear. Test results and conclusions are presented.
Date:
March 18, 1964
Creator:
George, D. K. & Hollifield, P. J.
Partner:
UNT Libraries Government Documents Department