ORR Operations for Period April 1961 to April 1962
Description:
A summary of the activities in the 4th operational year is presented for the ORR. On-stream time at 30 Mw was relatively steady with 75.4 and 83.7% representing the lowest and highest quarters. Modification of the ball-latch mechanism of the shim-rod-drives is in progress. The primary cooling system bypass control valve was modified and a d-c pony motor was added at the No. 3 primary pump. This addition was made to increase the reliability of adequate water flow for afterheat cooling. A study o…
more
Date:
October 16, 1962
Creator:
Binford, F.T.; Casto, W.R. & Colomb, A.L.