W-320 waste retrieval sluicing system transfer line flushing volume and frequency calculation
Description:
The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Waste Retrieval Sluicing System (WRSS) process line flushes. The WRSS was installed by Project W-320, Tank 24 I-C-106 Sluicing. The double contained pipelines being flushed have 4 inch stainless steel primary pipes. The flushes are intended to prevent hydrogen build up in the transfer lines and to provide ALARA conditions for maintenance per…
more
Date:
November 5, 1997
Creator:
Bailey, J. W.
Partner:
UNT Libraries Government Documents Department