Fission Product Activity in SM-1 Core I Primary System and Surface Contamination on SM-1 Type Fuel Elements. Task XVIII, Phases 2 and 3

Description: Abstract; The fission product data obtained during SM-1 Core I operation (June 1957 - May 1960) is reviewed briefly and interpreted. Evidence is presented to indicate that a fuel element defect was responsible for the high fission product activity level observed in the primary coolant. Relative escape coefficients are calculated and the defect size estimated. Anticipated fission product levels during SM-1 Core II and SM-1A Core I operation are estimated from alpha surface contamination data o… more
Date: February 28, 1961
Creator: Hasse, Robert A. & Zegger, John L.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.

Description: Abstract: Test procedures for special tests involving in-core SM-1 temperature and flow instrumentation are described (Task XIV Package Tests). These tests involve in-core steady state flow and temperature measurements, loss of flow transients, load transients, reduced primary system pressure operations and reduced element flow. The thermal and hydraulic conditions prevailing in these tests, including steady state and transient burnout rations, are developed. The effects of reduced system pres… more
Date: February 28, 1962
Creator: Bradley, P. L. & Coombe, J. R.
Partner: UNT Libraries Government Documents Department
open access

BWR Reference Design for PL-3

Description: Abstract: The natural circulation, direct cycle, boiling water reactor reference design presented in this technical report is the alternate to the preferred preliminary design developed under Phase I of the PL-3 contract. The report presents plant design criteria, summary of plant selection, plant description, reactor and primary system description, thermal and hydraulic analysis, nuclear analysis, control and instrumentation description, shielding description, auxiliary systems, power plant eq… more
Date: February 28, 1962
Creator: Humphries, G. E.
Partner: UNT Libraries Government Documents Department
open access

PWR Preliminary Design for PL-3

Description: Abstract: The pressurized water reactor preliminary design presented in this volume is the preferred design developed under Phase I of the PL-3 contact. This technical report presents plant design criteria, summary of plant selection, plant description, reactor and primary system description, thermal and hydraulic analysis, nuclear analysis, control and instrumentation description, shielding description, auxiliary systems, power plant equipment, waste disposal, buildings and tunnels, services, … more
Date: February 28, 1962
Creator: Humphries, G. E.
Partner: UNT Libraries Government Documents Department