Search Results

open access

Hawthorne Army Depot

Description: Department of Defense Clearinghouse Response: DoD Clearinghouse reply to a letter from the BRAC Commission regarding miscellaneous questions about Hawthorne Army Depot.
Date: August 8, 2005
Creator: United States. Department of Defense.
Partner: UNT Libraries Government Documents Department
open access

Underground Effects in the U12n.02 and U12n.03 Drifts, from the Midi Mist (U12n.02) Test, Area 12, Nevada Test Site

Description: Abstract: "The Midi Mist (U12n.02) event produced rock spalling along bedding, joint, and fault planes in the U12n.02 and U12n.03 drifts. The spalling in the U12n.02 drift started at about construction station 12 + 75 and was continuous toward the W.P. Most of the spalling in the U12n.03 drift occurred between C.S. 0 + 00 and 7 + 00."
Date: August 8, 1967
Creator: Ege, John R. & Danilchik, Walter
Partner: UNT Libraries Government Documents Department
open access

[Memorandum of Meeting: Day & Zimmermann Corp. Group, June 8, 2005]

Description: Memorandum of meeting with Day & Zimmermann Corp. Group regarding the Government-Owned Contractor-Operated (GOCO) facilities that it operates including a PowerPoint presentation prepared by Day & Zimmermann with the title: "Day & Zimmerman Munitions and Defense: BRAC Commission Review and Analysis, Joint Issues Team." Document also includes Joint Cross-Service group analysis documents, a local government proclamation, and a news article with the title: "Agreement May Save Plant Jobs."
Date: June 8, 2005
Creator: United States. Defense Base Closure and Realignment Commission.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen