Mark I 1/5-scale boiling water reactor pressure suppression experiment facility report
Description:
An accurate Mark I /sup 1///sub 5/-scale, boiling water reactor (BWR), pressure suppression facility was designed and constructed at Lawrence Livermore Laboratory (LLL) in 11 months. Twenty-seven air tests using the facility are described. Cost was minimized by utilizing equipment borrowed from other LLL programs. The total value of borrowed equipment exceeded the program's budget of $2,020,000. Substantial flexibility in the facility was used to permit independent variation in the drywell pres…
more
Date:
October 11, 1977
Creator:
Altes, R.G.; Pitts, J.H.; Ingraham, R.F.; Collins, E.K. & McCauley, E.W.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department