Search Results

open access

A Program of Two-Phase Flow Investigation Quarterly Report: First Quarterly Report, March-June, 1963

Description: Task A: Modification and Preparation of Experimental Facility. Facility engineering and layout is about seventy-five percent complete. Task B: Design and Construction of Test Sections. The major dimensions and characteristics of the metal and glass test sections have been calculated. One feasibility test of the electrically conducting coating on samples of glass tubing has been completed. Task C: Design and Construction of Test Stand, Task E: Pressure and Temperature Instrumentation for Test S… more
Date: June 24, 1963
Creator: Staub, F. W. & Zuber, N.
open access

A Program of Two-Phase Flow Investigation Quarterly Report: Second Quarterly Report, July-September, 1963

Description: Task A: Modification and Preparation of Experimental Facility. With the exception of the insulation of modified components, the experimental facility is complete. Insulation will be completed by the end of September. the system has been charged with Refrigerant-22 and preliminary loop performance tests have been completed without the test sections.. Task B: Design and Construction of Test Sections. The stainless steel test section has been prepared complete with end flanges and pressure tap loc… more
Date: September 23, 1963
Creator: Staub, F. W. & Zuber, N.
Back to Top of Screen