Search Results

open access

Experimental Stress Analysis of EGCR Pressure Vessel

Description: Report regarding the structural evaluations made of the upper head of the Experimental Gas Cooled Reactor (EGCR). This report includes descriptions of the model, experimental procedures, and analyses of the results. Appendix begins on page 139.
Date: 1961
Creator: Greenstreet, B. L.; Holland, R. W.; Maxwell, R. L.; Witt, F. J.; Shobe, L. R. & LaVerne, M. E.
open access

Large-Scale Slurry-Circulation System, 300-SM

Description: Design philosophy, status of component development, operational procedures, and limitations of each section of the Oak Ridge large-scale, high-temperature, thoria slurry facility.
Date: December 21, 1961
Creator: Parsly, L. F., Jr.; Falkenberry, H. L.; Harley, P. H.; Miller, I. M. & Kenyon, V. L.
open access

Thermonuclear Project Semiannual Progress Report: for Period Ending July 31, 1960

Description: From Introduction: "The present semiannual progress report introduces more active consideration than has been given in the past (by us, at least) to the importance of energy degradation in DCX-like devices. The following pages introduce also a new major apparatus designated as DCX-2. Some of these concepts cannot as yet be released publicly and therefore Chap. 3 of this report, covering the DCX-EP-B design, is being issued separately, with restricted distribution, as ORNL-3044."
Date: January 13, 1961
Back to Top of Screen