Search Results

open access

Accurate Computer Simulation of a Drift Chamber

Description: A general purpose program for drift chamber studies is described. First the capacitance matrix is calculated using a Green's function technique. The matrix is used in a linear-least-squares fit to choose optimal operating voltages. Next the electric field is computed, and given knowledge of gas parameters and magnetic field environment, a family of electron trajectories is determined. These are finally used to make drift distance vs time curves which may be used directly by a track reconstructi… more
Date: March 25, 1980
Creator: Killian, T J
open access

Advanced coal gasification system for electric power generation. Third quarterly progress report, April 1-June 30, 1980

Description: The operation, maintenance and modifications to the Westinghouse gasification process development unit during the quarter are reviewed. The tests of the gasifier-agglomerator included direct coal feed as well as oxygen-blown gasification of a char or coal bed. Then the whole system was tested in single and double stage operation. Laboratory support involved fluidized bed test facilities at ambient temperature and at design temperature for devolatilization and gasification studies. Other laborat… more
Date: July 25, 1980
open access

Advanced Gas-Cooled Nuclear Reactor Materials Evaluation and Development Program. Progress report, April 1, 1979-June 30, 1979

Description: The results are presented of work performed on the Advanced Gas-Cooled Nuclear Reactor Materials Evaluation and Development Program. The objectives of this program are to evaluate candidate alloys for Very High Temperature Reactor (VHTR) Nuclear Process Heat (NPH) and Direct Cycle Helium Turbine (DCHT) applications, in terms of the effect of simulated reactor primary coolant (helium containing small amounts of various other gases), high temperatures, and long time exposures, on the mechanical p… more
Date: January 25, 1980
open access

Advanced Gas Cooled Nuclear Reactor Materials Evaluation and Development Program. Progress report, January 1, 1980-March 31, 1980

Description: Results are presented of work performed on the Advanced Gas-Cooled Nuclear Reactor Materials Evaluation and Development Program. The objectives of this program are to evaluate candidate alloys for Very High Temperature Reactor (VHTR) Nuclear Process Heat (NPH) and Direct Cycle Helium Turbine (DCHT) applications, in terms of the effect of simulated reactor primary coolant (helium containing small amounts of various other gases), high temperatures, and long time exposures, on the mechanical prope… more
Date: June 25, 1980
open access

AFR/design and licensing information/BNFP as a model. Technical progress report, January-March 1980

Description: Work on this project is focused on developing design and licensing information for the model facility. Three major subcontracts have been approved by DOE and the design effort is progressing satisfactorily on the security system, rack design, and the soils structural and seismic design which these contracts cover. Licensing activities are progressing satisfactorily. About 50% of the Environmental Report is drafted and issued for preliminary review. Approximately 15% of the Safety Analysis Repor… more
Date: April 25, 1980
open access

AFR/Design and Licensing Information/BNFP As a Model. Technical progress report, October 1979-December 1979

Description: Work on the AFR spent fuel storage program is focused on developing design and licensing information for the model facility. To date, the design effort is proceeding on schedule. A subcontract for soils and structural design of the fuel transfers canal is ready for DOE review. Proposals for high-density rack design to bring the model facility up to a nominal 1750 MTU capacity have been received and are being reviewed internally. This subcontract should be available for DOE review in early Febru… more
Date: January 25, 1980
open access

AFR Spent Fuel Storage Program. Technical progress report, April 1980-June 1980

Description: Work on this project is focused on developing design and licensing information for the model facility. The three major subcontracts for soils and structural design, rack design, and the security system design are progressing satisfactorily. Design modification work at AGNS is near completion. Licensing documentation is approximately 50% complete and progressing at a satisfactory pace to meet scheduled projections.
Date: July 25, 1980
open access

Analysis of multipass laser amplifier systems for storage laser media

Description: The performance characteristics of single pass and multipass storage laser amplifiers are presented and compared. The effects of the multipass amplifier parameters on the extraction characteristics are examined. For a wide range of conditions the multipass amplifier is found to provide high energy gain and high efficiency simultaneously. This is a significant advantage over the single pass laser amplifier. Finally, three specific storage laser amplifier systems, flashlamp pumped V:MgF/sub 2/, X… more
Date: March 25, 1980
Creator: Harvey, James F.
open access

Angular measurements in optical testing

Description: The measurement of angles plays an important role in practically every discipline of optics, including prism manufacture, optical assembly and alignment. It is the purpose of this paper to review some of the angle measurement techniques and how they are used in optical testing.
Date: September 25, 1980
Creator: Thomas, N.L.
open access

Assessment of the potential of colloidal fuels in future energy usage. Final report. [97 references]

Description: Pulverized coal has been an increasing important source of energy over the past century. Most large utility boilers, all modern coking plants, and many industrial boilers and blast furnaces employ pulverized coal as a major feed stream. In periods of oil shortages, such as during World Wars I and II, the concept of adding powdered coal to oil for use in combustion equipment originally designed for oil has been actively pursued but rarely used. Over this same period of time, there have been atte… more
Date: February 25, 1980
open access

Capacity-expansion planning under uncertainty in the electric-utility industry

Description: This document basically represents a comparison between theory and practice of capacity-expansion planning in the electric-utility industry. The purpose of the comparison is to provide avenues for further exploration in utility decision making. The focus of the Phase II study is upon the role of uncertainty in the decision-making process. The Phase I effort was directed at modeling the Averch-Johnson theory of the regulated utility. Part I of this report reviews the Anderson study (D. Anderson,… more
Date: July 25, 1980
Creator: Soyster, A.L.
open access

Development of software for computer assisted model simplification. Final report. [Lagrange multipliers]

Description: The final report of DBS Corporation on the model simplification project is presented. The purpose of the project is to develop computer-assisted model simplification. The contributions of DBS to this project where an initial overall project assessment, contributions to design principles and testing procedures, specific experimental designs, and initial test results. The main contributions of DBS to this project were in the area of LP matrix scaling, and particularly in the potential usefulness … more
Date: April 25, 1980
open access

Energy efficient buildings. Technical potentials and policy recommendations for conservation and renewable resources: a least cost scenario, 1980-2000

Description: Working from the premise that the largest and least expensive source of energy in the US in the next 20 y is the energy that could be saved in buildings, building energy consumption in commercial and residential buildings is examined, and the energy savings which could be accomplished by more efficient building design, by energy conserving retrofits and by the use of solar heating equipment are discussed. (LCL)
Date: July 25, 1980
Creator: Rosenfeld; Goldstein; Harris; Claridge & Gawell
open access

Environmental monitoring at the Lawrence Livermore Laboratory. 1979 annual report

Description: Information on monitoring activities is reported in two sections for EDB/ERA/INIS. The first section covers all information reported except Appendix D, which gives details of sampling and analytical procedures for environmental monitoring used at Lawrence Livermore Laboratory. A separate abstract was prepared for Appendix D. (JGB)
Date: April 25, 1980
Creator: Silver, W. J.; Lindeken, C. L.; White, J. H. & Buddemeir, R. W.
open access

Evaluation and demonstration of methods for improved fuel utilization. First semi-annual progress report, September 1979-March 1980

Description: Demonstrations of improved fuel management and burnup are being performed in the Fort Calhoun reactor. More efficient fuel management will be achieved through the implementation of a low leakage concept called SAVFUEL (Shimmed And Very Flexible Uranium Element Loading), which is expected to reduce uranium requirements by 2 to 4%. The burnup will be increased sufficiently to reduce uranium requirements by 5 to 15%. Four fuel assemblies scheduled to demonstrate the SAVFUEL duty cycle and loaded i… more
Date: June 25, 1980
Creator: Decher, U.
open access

Evaluation of cracking in feedwater piping adjacent to the steam generators in Nine Pressurized Water Reactor Plants

Description: Cracking in ASTM A106-B and A106-C feedwater piping was detected near the inlet to the steam generators in a number of pressurized water reactor plants. We received sections with cracks from nine of the plants with the objective of identifying the cracking mechanism and assessing various factors that might contribute to this cracking. Variations were observed in piping surface irregularities, corrosion-product, pit, and crack morphology, surface elmental and crystal structure analyses, and stee… more
Date: June 25, 1980
Creator: Goldberg, A.; Streit, R. D. & Scott, R. G.
open access

Fire protection countermeasures for containment ventilation systems

Description: The goal of this project is to find countermeasures to protect High Efficiency Particulate Air (HEPA) filters, in exit ventilation ducts, from the heat and smoke generated by fire. Initially, methods were developed to cool fire-heated air by fine water spray upstream of the filters. It was recognized that smoke aerosol exposure to HEPA filters could also cause disruption of the containment system. Through testing and analysis, several methods to partially mitigate the smoke exposure to the HEPA… more
Date: August 25, 1980
Creator: Alvares, N.; Beason, D.; Bergman, V.; Creighton, J.; Ford, H. & Lipska, A.
open access

Kinetics and Mechanisms of Catalytic Hydroliquefaction and Hydrogasification of Lignite. Quarterly Report, April-June 1980

Description: Progress is reported in the research project aimed at investigation of the basic chemical kinetics and mechanisms in catalytic hydrogenation of lignite suspended in a carrier oil in a continuous reactor operating at steady state. Specifically, the research is designed to study the overall conversion rate and the elemental transformation from the raw materials into products under surface reaction cntrolling conditions and to postulate the reaction mechanisms of hydroliquefaction and hydrogasific… more
Date: September 25, 1980
Creator: Weiss, A. H.; Kranich, W. L. & Gueruez, K.
open access

Lawrence Livermore Laboratory's Beryllium Control Program for High-Explosive Test Firing Bunkers and Tables

Description: This report on the control program to minimize beryllium levels in Laboratory workplaces includes an outline of beryllium surface, soil, and air levels and an 11-y summary of sampling results from two high-use, high-explosive test firing bunkers. These sampling data and other studies demonstrate that the beryllium control program is functioning effectively.
Date: November 25, 1980
Creator: Johnson, J. S.
open access

Negative deuterium ions for tandem mirror next step and tandem mirror reactors

Description: Recent designs for mirror fusion reactors with good power balance include ambipolar potential plugs to reduce end losses and thermal barriers to maintain a difference in electron temperature between the large-volume central cell plasma and the confining end plugs. These designs led to several new requirements for D/sup 0/ neutral beams derived from negative ions at energies of 150 to 200 keV and possibly higher. Such beams are required for injection of fat ions into the plugs and the barrier an… more
Date: September 25, 1980
Creator: Hamilton, G.W.
open access

Procedures for safe handling of off-gases from electric vehicle lead-acid batteries during overcharge

Description: The potential for generation of toxic gases from lead-acid batteries has long been recognized. Prior to the current interest in electric vehicles, there were no studies specificaly oriented to toxic gas release from traction batteries, however. As the Department of Energy Demonstration Project (in the Electric and Hybrid Vehicle Program) progresses, available data from past studies and parallel health effects programs must be digested into guidance to the drivers and maintenance personnel, tail… more
Date: January 25, 1980
Creator: LaBelle, S.J.; Bhattacharyya, M.H.; Loutfy, R.O. & Varma, R.
Back to Top of Screen