6 GeV light source project cost estimating procedure

Description: To maintain uniformity in estimating the cost requirements of the various components of the 6 GeV Light Source, the following procedure will be used by all the task groups. The procedure uses a Work Breakdown Structure (VBS) to break down the project into manageable, easy to estimate, components. The project is first broken down into major tasks or categories. Then each major division is continuously subdivided until the desired level of detail is achieved. This can be shown best by using the e… more
Date: October 23, 1985
open access

Additional muon calculations for the SLC positron source

Description: This note is an update to the muon calculations presented in CN-221 and takes into account: (1) a more complete muon production and transport model, including an estimate of wide angle production based on experimental data, (2) additional earth shielding that will be added on top and both sides of the 2/3 tunnel areas, and (3) a detailed analysis of the earth profile as it pertains to shielding in the direction of the SLAC site boundary. The highest annual dose at the SLAC boundary is found to … more
Date: April 23, 1985
Creator: Nelson, W. R. & McCall, R. C.
open access

Gas generation results and venting study for transuranic waste drums

Description: Sixteen waste drums, containing six categories of plutonium-contaminated waste, were monitored for venting and gas generation for six months. The venting devices tested appeared adequate to relieve pressure and prevent hydrogen accumulation. Most of the gas generation, primarily H2 and CO2, was due to radiolytic decomposition of the hydrogenous wastes. Comparison of the gas yields with those obtained previously in laboratory tests showed very reasonable agreement with few exceptions.
Date: September 23, 1985
Creator: Kazanjian, A. R.; Arnold, P. M.; Simmons, W. C. & D'Amico, E. L.
open access

High-Yield Lithium-Injection Fusion-Energy (HYLIFE) reactor

Description: The High-Yield Lithium-Injection Fusion Energy (HYLIFE) concept to convent inertial confinement fusion energy into electric power has undergone intensive research and refinement at LLNL since 1978. This paper reports on the final HYLIFE design, focusing on five major areas: the HYLIFE reaction chamber (which includes neutronics, liquid-metal jet-array hydrocynamics, and structural design), supporting systems, primary steam system and balance of plant, safety and environmental protection, and co… more
Date: December 23, 1985
Creator: Blink, J. A.; Hogam, W. J.; Hovingh, J.; Meier, E. R. & Pitts, J. H.
open access

Metallurgical analysis of a 304L stainless steel canister from the Spent Fuel Test - Climax

Description: Results of a metallurgical examination of a type 304L stainless steel canister that had been used to store spent nuclear fuel in an underground granite formation for about three years are reported. No observable corrosion or cracking were found. The results are applied to waste packages in a potential high level nuclear waste repository in tuff. 10 refs., 9 figs., 2 tabs.
Date: April 23, 1985
Creator: Weiss, H.; Van Konynenburg, R.A. & McCright, R.D.
open access

Physical phenomena induced by passage of intense electromagnetic pulses (including CO/sub 2/ lasers) through the atmosphere

Description: The electron fluid equations are combined with Maxwell's equations to investigate the physical phenomena that occurs when short, intense electromagnetic pulses (including the CO/sub 2/ laser pulse) interact with the atmosphere. The phenomena of ''tailed erosion'' occurs when the pulse intensity exceeds the air-breakdown threshold. In some cases, the erosion of the pulse occurs first in the middle of the pulse and then occurs in the tail of the pulse. In addition, we discovered that the amount o… more
Date: October 23, 1985
Creator: Yee, J. H.; Mayhall, D. J. & Alvarez, R.
open access

Remote Engineering progress report, January-December 1984

Description: This report summarizes progress on work performed in the Remote Engineering group at Rocky Flats from January to December 1984. Remote Engineering's goals in all 1984 projects were to help increase production capacity, reduce radiation exposure, improve operation safety, improve product quality, or alleviate material-accounting errors. To convert manual operations to automated operations, Remote Engineering provided design, fabrication, and assembly of new equipment for varied plant operations.… more
Date: December 23, 1985
Creator: Phillips, D.E.
open access

Report of the Attorney General to the Safe Growth Cabinet Council

Description: On January 7, 1983, President Reagan signed into law the Nuclear Waste Policy Act (NWPA), 42 U.S.C. {section} 10101 et seq. As part of the Act, the Congress of the United States authorized construction of a permanent deep geologic repository in an effort to solve the nation's problem with disposal of spent nuclear fuel and high-level radioactive waste. Congress also directed the Department of Energy (DOE) to study the need for and feasibility of constructing a monitored retrievable storage (MRS… more
Date: September 23, 1985
Creator: Cody, W.J.
open access

Report of the Attorney General to the Safe Growth Cabinet Council

Description: On January 7, 1983, President Reagan signed into law the Nuclear Waste Policy Act (NWPA), 42 U.S.C. {section} 10101 et seq. As part of the Act, the Congress of the United States authorized construction of a permanent deep geologic repository in an effort to solve the nation`s problem with disposal of spent nuclear fuel and high-level radioactive waste. Congress also directed the Department of Energy (DOE) to study the need for and feasibility of constructing a monitored retrievable storage (MRS… more
Date: September 23, 1985
Creator: Cody, W. J.