Decontamination Program Task II. Volume II, Evaluation of Chemical Agents for Nuclear Reactor Decontamination

Description: Abstract: The caustic permanganate-rinse decontamination treatment was investigated. Loop and metallurgical studies were performed to determine optimum operating conditions as well as the metallurgical effects of the treatment. A treatment with 10 percent sodium hydroxide and 5 percent potassium permanganate solution followed by a rinse with a 5 percent ammonium citrate, 2 percent citric acid and 1/2 percent Versene solution was chosen for the decontamination of a stainless steel steam generat… more
Date: February 15, 1959
Creator: Zegger, John L. & Pancer, Guyon P.
open access

Evaluation of Kanigen, Electroless Nickel Plating for Steam Side of a Sodium Component Steam Generator

Description: Introduction: This is a final report on the evaluation of Kanigen electroless nickel plating for surfaces in contact with water and steam i a sodium heated AISI Type 316 stainless steel steam generator. The purpose of the coasting was to afford protection from stress corrosion cracking originating on the water-steam side of the unit. It has been concluded that the kanigen coating does not afford adequate protection for the services condition intended. This work was performed as part of the r… more
Date: February 15, 1961
Creator: Alco Products (Firm).
open access

Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section

Description: Abstract: In the March-April 1962 shutdown of SM-1 Core II, the SM-28 element will be re-inserted in SM-1 Core II and an SM-1 Core I element will be removed. An SM-1 Core II europium absorber will be replaced by a Ag-Cd-In absorber, and surveillance specimens will be inserted above the core support structure. Analysis of these changes concludes that re-insertion of the SM-2B stationary element and insertion of surveillance specimens do not affect hazards potential previously defined for SM-1.… more
Date: March 15, 1962
Creator: Stephenson, L. D.
open access

Radiochemical Analysis of Crud from the Army Package Power Reactor

Description: Abstract: A study has been made of the radiochemical composition and the specific activity of insoluble corrosion products (crud) removed from the primary system of the APPR-1. This report presents the results of analysis of twelve crud samples collected during the interval from September 3, 1957 to December 1, 1957. The samples were radiochemically analyzed for long-lived gamma emitting nuclides only. Data are presented on the measured values of the specific activity of crud, the ratios of th… more
Date: February 15, 1958
Creator: Zegger, J. L.; Small, W. J. & Brown, W. S.
open access

Reactor Analysis APPR-1 Core II

Description: Preface; Subsequent to the analysis in the body of this report metallurgical developments indicated that it would not be feasible to build the APPR-1 Core II with the increased boron loading specified herein. At the time of the issuance of this report the Core II boron loading is to be the same as that for Core I. At the time of procurement of the core in the fall, if metallurgical developments warrant, the increased boron loading will be employed. The loading discussed in the body of the r… more
Date: July 15, 1958
Creator: Williamson, T. G.; Leibson, M. J. & Bryne, B. J.
open access

Zero Power Experiments for the SM-1 Core II : Task XV

Description: Abstract: An element by element reactivity check for SM-1 Core II fuel elements and control rod absorber sections was performed and the burnable nuclear poison loading in the SM-1 Core II stationary fuel elements was established. An approach to criticality of the SM-1 Core II was performed by the inverse multiplication method and the critical rod bank position obtained as a function of fuel loading up to the full SM-1 Core II loading. Maximum and minimum core reactivity measurements were obtai… more
Date: March 15, 1960
Creator: Robinson, R. A.; Weiss, S. H.; McCool, W. J. & Schrader, E. W.