105 K-West isolation barrier leak recovery plan
Description:
Leak testing is being performed in 105 KW to verify the performance of the isolation barriers which have been recently installed. When an 11 inch differential head is established between the main basin and the discharge chute, a leak-rate of approximately 30 - 35 gpm is observed. The leak-rate would be achieved by a 1.65`` - 2`` diameter hole (or equivalent). Analyses suggest that the flow is turbulent/laminar transitional (dominantly turbulent), which would be indicative of a single point leak…
more
Date:
March 2, 1995
Creator:
Wiborg, J.C.
Item Type:
Refine your search to only
Report