UNT Libraries Government Documents Department - 11,774 Matching Results

Search Results

open access

3-D turbulent particle dispersion submodel development. Quarterly progress report No. 1, 5 April--5 July 1991

Description: The lack of a mathematical description of the interactions of fluid turbulence with other physics-chemical processes is a major obstacle in modeling many industrial program. Turbulent two-phase flow is a phenomenon that is of significant practical importance to coal combustion as well as other disciplines. The interactions of fluid turbulence with the particulate phase has yet to be accurately and efficiently modeled for these industrial applications. On 15 May 1991 work was initiated to cover … more
Date: December 31, 1991
Creator: Smith, P. J.
open access

3-D turbulent particle dispersion submodel development. Quarterly progress report No. 2, 15 July--15 October 1991

Description: The lack of a mathematical description of the interactions of fluid turbulence with other physics-chemical processes is a major obstacle in modeling many industrial program. Turbulent two-phase flow is a phenomenon that is of significant practical importance to coal combustion as well as other disciplines. The interactions of fluid turbulence with the particulate phase has yet to be accurately and efficiently modeled for these industrial applications. On 15 May 1991 work was initiated to cover … more
Date: December 31, 1991
Creator: Smith, P. J.
open access

4-D High-Resolution Seismic Reflection Monitoring of Miscible CO2 Injected into a Carbonate Reservoir

Description: The objective of this research project is to acquire, process, and interpret multiple high-resolution 3-D compressional wave and 2-D, 2-C shear wave seismic data in an attempt to observe changes in fluid characteristics in an oil field before, during, and after the miscible carbon dioxide (CO{sub 2}) flood that began around December 1, 2003, as part of the DOE-sponsored Class Revisit Project (DOE DE-AC26-00BC15124). Unique and key to this imaging activity is the high-resolution nature of the se… more
Date: August 31, 2006
Creator: Miller, Richard D.; Raef, Abdelmoneam E.; Byrnes, Alan P. & Harrison, William E.
open access

8. Innovative Technologies: Two-Phase Heat Transfer in Water-Based Nanofluids for Nuclear Applications Final Report

Description: Abstract Nanofluids are colloidal dispersions of nanoparticles in water. Many studies have reported very significant enhancement (up to 200%) of the Critical Heat Flux (CHF) in pool boiling of nanofluids (You et al. 2003, Vassallo et al. 2004, Bang and Chang 2005, Kim et al. 2006, Kim et al. 2007). These observations have generated considerable interest in nanofluids as potential coolants for more compact and efficient thermal management systems. Potential Light Water Reactor applications inclu… more
Date: July 31, 2009
Creator: Buongiorno, Jacopo & Hu, Lin-wen
open access

10 MMBt/Hr AFBC Commercial Demonstration Cedar Lane Farms

Description: The objective of this project was to demonstrate and promote the commercialization of coal-fired atmospheric fluidized bed combustion (AFBC) systems, with limestone addition for SO2 emissions control and a baghouse for particulate emissions control. This AFBC system was targeted for small scale industrial-commercial-institutional space and process heat applications in the 4-40 MMBtu/hr size range. A cost effective and environmentally acceptable AFBC technology in this size range could displace … more
Date: October 31, 2005
Creator: Keener, Harold M.; Wicks, Mary H.; Machamer, Tom; Hoecke, Dave; Bonk, Don & Brown, Bob
open access

12-INCH SODIUM FLOW CONTROLLER. Technical Manual 20357

Description: A manual is presented for the Sodium Flow Controller used in controlling flow to regulate heat transfer in a liquid metal nuclear power plant. A description of the controller, general installation and operational pointers, installation instructions, instructions for dismantling of the Sodium Flow Controller, instructions for assembly of Sodium Flow Controller, list of special tools and fixtures, and repair parts list are given. (M.C.G.)
Date: October 31, 1962
open access

16,000-rpm Interior Permanent Magnet Reluctance Machine with Brushless Field Excitation

Description: The reluctance interior permanent magnet (RIPM) motor is currently used by many leading auto manufacturers for hybrid vehicles. The power density for this type of motor is high compared with that of induction motors and switched reluctance motors. The primary drawback of the RIPM motor is the permanent magnet (PM) because during high-speed operation, the fixed PM produces a huge back electromotive force (emf) that must be reduced before the current will pass through the stator windings. This re… more
Date: October 31, 2007
Creator: Hsu, J. S.; Burress, T. A.; Lee, S. T.; Wiles, R. H.; Coomer, C. L.; McKeever, J.W. et al.
open access

40-MW(e) Prototype High-Temperature Gas-Cooled Reactor Research and Development Program. Quarterly Progress Report for the Period Ending June 30, 1962

Description: Research and development progress specifically directed toward the construction of a 40-Mw(e) prototype power plant employing a high-temperature, gas-cooled, graphitemoderated reactor known as the HTGR is reported. Irradiation of element III-B in the in-pile loop continued satisfactorily. The element has generated a total of l36.3 Mw-hr of fission heat. The gross activity in the purge stream increased slightly to about 350 mu C/cm/sup 3/. By taking larger gas samples than were previously taken,… more
Date: October 31, 1963
open access

45 Day safety screen results for Tank 241-C-108 -- Augers 94-012, 94-014 and 94-015

Description: Three auger samples from Tank C-108 (on the Ferrocyanide Watch List) were received by the 222-S laboratories. These samples underwent safety screening analysis (DSC, TGA, and Alpha Total) in accordance with reference below. No results exceeded the notification criteria. Due to the calculated depth of sludge at riser 7, two augers were used to sample the sludge. The first (94-AUG-012) was a ten inch auger, the second (94-AUG-014) was a 20 inch auger. One 20 inch auger (94-AUG-015) was used to sa… more
Date: January 31, 1995
Creator: Rice, A. D.
open access

60-Day waste compatibility safety issues and final results for AY-102 grab samples

Description: Four grab samples (2AY-96-15, 2AY-96-16, 2AY-96-17, and 2AY-96-18) were taken from Riser 15D of Tank 241-AY-102 on October 8, 1996, and received by 222-S Laboratory on October 8, 1996. These samples were analyzed in accordance with Compatibility Grab Sampling and Analysis Plan (TSAP) and Data Quality Objectives for Tank Farms Waste Compatibility Program (DQO) in support of the Waste Compatibility Program. No notifications were required based on sample results.
Date: January 31, 1997
Creator: Nuzum, Jennifer L.
open access

84-Kilometer Radiological Monitoring Grid

Description: The purpose of this report is to document the development of a radial grid that is suitable for evaluating the pathways and potential impacts of a release of radioactive materials to the environment within a distance of 84 kilometers.
Date: July 31, 2000
Creator: Roe, L.
open access

100 LPW 800 Lm Warm White LED

Description: An illumination grade warm white (WW) LED, having correlated color temperature (CCT) between 2800 K and 3500K and capable of producing 800 lm output at 100 lm/W, has been developed in this program. The high power WW LED is an ideal source for use as replacement for incandescent, and Halogen reflector and general purpose lamps of similar lumen value. Over the two year period, we have made following accomplishments: developed a high power warm white LED product and made over 50% improvements in l… more
Date: October 31, 2010
Creator: Sun, Decai
open access

100-N technical manual. Volume 2A: Systems descriptions

Description: This report contains engineering drawings for the control room, reactor monitoring systems, and reactor control systems for the N reactor. Each console in the control room is detailed. Other systems discussed are: stack air monitoring system, charging machine control systems, and heating and ventilation control systems. A N reactor plant glossary is included.
Date: December 31, 1963
open access

101-SY Dome pressure issues surrounding mitigation pump decontamination during removal

Description: This document addresses issues related to use of the spraywands and ring used to decontaminate the mitigation pump installed in 101-SY. It has been determined that use of the wands will influence tank dome pressures as a function of ventilation system configuration, spray drop size, rinse water temperature, and rate at which spraywand flows are established.
Date: January 31, 1995
Creator: Shaw, S.W.
open access

105 K East isolation barrier acceptance analysis report

Description: The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KE/100K. The tests were performed in accordance with the test plan (McCracken 1995c) and acceptance test procedure (McCracken 1995a). The test report (McCracken 1995b) contains the test data. This document compares the test data (McCracken 1995b) against the criteria (McCracken 1995a, c). A discussion of the leak rate analytical characterization (Irwin 1995) describes… more
Date: May 31, 1995
Creator: McCracken, K. J. & Irwin, J. J.
open access

105-N basin sediment disposition phase-two sampling and analysis plan

Description: The sampling and analysis plan for Phase 2 of the 105-N Basin sediment disposition task defines the sampling and analytical activities that will be performed to support characterization of the sediment and selection of an appropriate sediment disposal option.
Date: December 31, 1997
open access

AN-107 entrained solids - Solubility versus temperature

Description: This report describes the results of a test conducted by Battelle to assess the solubility of the solids entrained in the diluted AN-107 low-activity waste (LAW) sample. BNFL requested Battelle to dilute the AN-107 sample using sodium hydroxide and de-ionized water to mimic expected plant operating conditions. BNFL further requested Battelle to assess the solubility of the solids present in the diluted AN-107 sample versus temperature conditions of 30, 40, and 50 C. BNFL requested these tests t… more
Date: March 31, 2000
Creator: Lumetta, Gregg J. & Lettau, Ralph C.
open access

120-D-1 (100-D) ponds training plan

Description: This is the Environmental Restoration Contractor Team training plan for the 100-D Ponds treatment, storage, and disposal unit. This plan is intended to meet the requirements of WAC 173-303-330 and the Hanford Dangerous Waste Permit. The WAC 173-303-330(1)(d)(ii, v, vi) requires that personnel be familiar, where applicable, with waste feed cut-off systems, proper responses to groundwater contamination incidents, shutdown of operations, response to fire or explosion, and other process operation a… more
Date: December 31, 1997
Creator: Mitchem, G. B.
Back to Top of Screen