UNT Libraries Government Documents Department - 19,114 Matching Results

Search Results

Primary view of 1. K+ Charge Exchange - Search For K+ Charge Exchange
Birge, Robert W.; Courant, Hans J.; Lanou, Robert E., Jr. & Whitehead, Marian N.
July 29, 1959
Primary view of 1. Summary of Runs, s56, 57, 73, 74, 78, 79, 80, 87, 88, 89 in Which Slurries Circulated at 300 C in 100-a Loops Caked or Accumulated on Pipe Walls. 2. Summary of Runs T-52 Through T-75 in Which a Bypass Line Was Used in Parallel With Main Circulating Loop
Kitzes, A. S.; Gallaher, R. B.; McLaughlin, C. A. & Wichner, R. P.
November 16, 1956
Primary view of 3 Plant Radiation Study Interim Report #5- Part II Data on Gamma Shielding of Special Plutonium Samples
Moulthrop, H. A.
October 22, 1959
Primary view of 4-Channel Line Driver: Modified
Titterton, E. W.
1950?
Primary view of 4-X program: UO{sub 3} plant expansion
Ingalls, W. P.
September 16, 1954
Primary view of THE (5-PHENYL-2-OXAZOLYL)PYRIDINES AS FLUORESCENT pH INDICATORS. AN APPLICATION TO CHEMICAL RADIATION DOSIMETRY
Ott, Donald G.
August 1, 1958
Primary view of 6.70 EV Resonance in U²³⁸
Levin, Jules S.
November 9, 1953
Primary view of 7 questions to ask when you buy or sell shelled corn by grade.
United States. Extension Service.
February 1952
Primary view of An 8-Foot Axisymmetrical Fixed Nozzle for Subsonic Mach Numbers Up to 0.99 and for a Supersonic Mach Number of 1.2
Ritchie, Virgil S.; Wright, Ray H. & Tulin, Marshall P.
February 23, 1950
Primary view of 9-Zoom : A One-Dimensional, Multigroup, Neutron Diffusion Theory Reactor Code for the IBM 709
Stone, S. P.; Collins, E. T. & Lenihan, S. R.
August 25, 1959
Primary view of 10-Megawatt Aqueous Homogeneous Circulating Solution Reactor for Producing Electrical Power in Remote Locations
Montgomery, D. W.; Dodson, W. J.; Kaiser, F. F.; Luckow, W. K. & Pashos, T. J.
August 1, 1953
Primary view of 10 MWe Sodium Deuterium Reactor Design Report
Davis, Peter J.
1959
Primary view of 11,400 KW Nuclear Power Plant Employing an Organic Moderated Reactor: Preliminary Description
Wheelock, C. W.
1957
Primary view of 15 MW Gas-Cooled Closed-Cycle Reactor Power System Study: Final Report, Volumes 1-2
Ford Instrument Company
April 1, 1957
Primary view of 17-keV x-ray output of plutonium
McCall, R. C. & Bernard, R. M.
November 5, 1958
Primary view of 20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission
Gilbert Associates, Inc.
July 7, 1957
Primary view of 20-MW D₂O-Moderated Experimental Boiling Water Reactor Design Studies
Iskenderian, H. P.
February 1957
Primary view of 25 content of initial lots of Hanford UO{sub 3}
Work, J. B.
May 28, 1952
Primary view of "25" Critically Consultation with J. W. Morfitt : April 3, 1950
Merrill, E. T. & Sege, G.
April 3, 1950
Primary view of 25 Process Assistance for Period of March 21, 1955 to April 1, 1955
Culler, F. L.
April 11, 1955
Primary view of 25 Process Assistance. For Period of May 2, 1955 to May 13, 1955
Culler, F L
May 23, 1955
Primary view of 30 Rv. Power Supply
U.S. Atomic Energy Commission
1950?
Primary view of A 37,500 KW Power Reactor with Competitive Possibilities
Thompson, W. I. & Cohen, Karl
February 26, 1954
Primary view of 50-Channel Pulse-Height Analyzer Accelerator Type. Maintenance Manual
Heller, R. E.
December 15, 1953
Back to Top of Screen